Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
11/08/2023
Applicant:
Lisa Bowers
Description:
New Modular Structure (already reviewed by State) for Gyroshack

Permit Reviews

Permit Number - TC-COM-1123-02617
Permit Status: Complete
Permit Description: New Modular Structure (already reviewed by State) for Gyroshack
Start Date Submittal Complete Date Status  
09/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/30/2024 APPROVED Review Details
12/02/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/03/2024 APPROVED Review Details
03/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/11/2024 APPROVED Review Details
12/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/19/2024 REQUIRES RESUBMIT Review Details
11/16/2023 COMMERCIAL REVIEW - FULL v.1 12/14/2023 REQUIRES RESUBMIT Review Details
02/15/2024 COMMERCIAL REVIEW - FULL v.3 02/22/2024 APPROVED Review Details
02/22/2024 RESTAMP - COMMERCIAL v.1 02/27/2024 REQUIRES RESUBMIT Review Details
12/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/13/2024 APPROVED Review Details
01/11/2024 COMMERCIAL REVIEW - FULL v.2 02/08/2024 REQUIRES RESUBMIT Review Details
12/20/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/23/2024 APPROVED Review Details
01/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/30/2025 APPROVED Review Details
02/28/2024 RESTAMP - COMMERCIAL v.2 02/29/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-1123-02617
Permit Status: Complete
Permit Description: New Modular Structure (already reviewed by State) for Gyroshack
Date Description Comments
02/21/2024 AIR BALANCING REPORT IS REQUIRED.
09/30/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/15/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/28/2023 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
11/28/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/30/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
11/28/2023 This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit.
11/28/2023 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
11/28/2023 Coordinate with the State for their inspection of the installed structure.
02/21/2024 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor.
11/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/28/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
02/21/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1123-02617
Permite Description: New Modular Structure (already reviewed by State) for Gyroshack
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/21/2024 COT - LCEL - Electrical Underground N/A Partial Pass 6/21/2024 remaining secondaries to new transformer location. Okay to backfill. Shading required.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1123-02617
Permit Description: New Modular Structure (already reviewed by State) for Gyroshack
Total Completed Inspections - 16
Date Description Inspector Results Comments
03/22/2024 COT - LCBU - Excavation/Rebar/Zoning Passed
04/30/2024 COT - LCPL - Yard Water Line Passed 4/30/24: Main water line under pressure. Ok to backfill. Shading required
06/05/2024 COT - LCPL - Gas Pressure Test Passed
06/05/2024 COT - LCPL - Rough Soil Passed Partial approval for grease, interceptor, and sewer lines underground to site sewer connection OK to cover
6/5/24: plumbing underground per plan ok to proceed
10/11/2024 BULD - Electrical Clearance Passed 10/11/24: TEP ECO CLEARANCE FOR 1610 E TUCSON MARKETPLACE BL
11/07/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 11/7/2024
12/12/2024 COT - FCON - Fire - Final Passed
12/13/2024 TRSP - ROW - Final/Close-Out Passed
12/16/2024 COT - HCBU - Excavation/Rebar/Zoning Passed
12/16/2024 COT - LCEL - Electrical Underground Passed
12/16/2024 COT - LCEL - Grounding/Bonding Passed
12/16/2024 COT - LCBU - Building Final Passed 12/16/24: ok for CofO pending conditions.
12/16/2024 COT - LCEL - Electrical Final Passed
12/16/2024 COT - LCPL - Plumbing Final Passed
12/16/2024 ENGR Engineering Final Passed Everything completed for sign off for Pate construction, site is ready for a CO
12/16/2024 COT - LCEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
FIRE AND STATE FOR LOC_V1.PDF DOCUMENTS VIEW
AIR BALANCE REPORT - GYRO SHACK_V2.PDF DOCUMENTS VIEW
TC-COM-1123-02617 WATER STERILIZATION REPORT-2024-11-25_V1.PDF DOCUMENTS VIEW
TC-COM-1123-02617 FINAL SPECIAL INSPECTION REPORT-2024-09-24_V1.PDF DOCUMENTS VIEW
2_STATE APPROVED DRAWINGS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-3_PLAN SET_V3.PDF DOCUMENTS VIEW
2_STATE APPROVED DRAWINGS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-3_PLAN SET_V3.PDF DOCUMENTS VIEW