Permit: TC-COM-1122-00155
Permit Details
Apply Date:
11/21/2022
Applicant:
David Shambach
Description:
Renovation of historic building, converting into a Pizzeria.
Permit Reviews
Permit Number - TC-COM-1122-00155
Permit Status: Complete
Permit Description: Renovation of historic building, converting into a Pizzeria.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/10/2023 | COMMERCIAL REVIEW - FULL v.3 | 03/13/2023 | APPROVED |
| 10/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/21/2024 | APPROVED |
| 02/01/2023 | COMMERCIAL REVIEW - FULL v.2 | 02/16/2023 | REQUIRES RESUBMIT |
| 12/08/2022 | COMMERCIAL REVIEW - FULL v.1 | 01/23/2023 | REQUIRES RESUBMIT |
| 12/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/19/2024 | REQUIRES RESUBMIT |
| 10/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/08/2024 | APPROVED |
Conditions
Permit Number - TC-COM-1122-00155
Permit Status: Complete
Permit Description: Renovation of historic building, converting into a Pizzeria.
| Date | Description | Comments |
|---|---|---|
| 10/01/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 02/01/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 02/01/2023 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
| 10/01/2024 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
| 03/13/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 02/01/2023 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 10/01/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 02/01/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 02/01/2023 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 10/01/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 02/01/2023 | KITCHEN HOOD FIRE SUPPRESSION SYSTEM/KITCHEN HOOD Designs must be submitted and approved prior to ... | |
| 10/01/2024 | KITCHEN HOOD FIRE SUPPRESSION SYSTEM/KITCHEN HOOD Designs must be submitted and approved prior to final | |
| 12/11/2024 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor. Please submit the email from IWC indicating the approval of your interceptor to satisfy this condition. | |
| 12/11/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/01/2023 | WATER STERILIZATION REPORT IS REQUIRED. | |
| 10/01/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1122-00155
Permite Description: Renovation of historic building, converting into a Pizzeria.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2023 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 12/14/2023 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | Duct system for hood to be wrapped and installed. |
| 11/17/2023 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 11/17/23 partial for inwall |
| 12/14/2023 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | Duct system for hood< smoke tested. Ok to wrap and install. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1122-00155
Permit Description: Renovation of historic building, converting into a Pizzeria.
Total Completed Inspections - 25
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2023 | COT - HCPL - Rough Soil | Passed | Grease interceptor at Southwest corner of building (75 gallon). Ok to cover progress area. | |
| 09/20/2023 | COT - HCBU - Framing | Passed | 9/20/23: framing in dining room, kitchen,service room, and exterior of bathroom 1 per plan. | |
| 11/17/2023 | COT - BULD - SWG Clearance | Passed | ||
| 11/17/2023 | COT - HCPL - Gas Pressure Test | Passed | ||
| 12/01/2023 | COT - HCEL - Electrical Intermediate | Passed | ok for drywall | |
| 04/22/2024 | COT - HCEL - Electrical Above Ceiling | Passed | Ok to set ceiling tiles. | |
| 09/10/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 09/10/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 09/10/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
| 09/10/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
| 09/10/2024 | COT - HCEL - Grounding/Bonding | Passed | ||
| 09/10/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
| 09/10/2024 | COT - HCME - Venting | Passed | ||
| 09/10/2024 | COT - HCPL - Yard Water Line | Passed | ||
| 09/10/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 10/08/2024 | COT - FCON - Fire - Final | Passed | ||
| 10/08/2024 | COT - FCON - Hood System - Final | Passed | ||
| 10/24/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 10/24/2024 | COT - HCME - Mechanical Final | Passed | ||
| 10/24/2024 | COT - HCPL - Gas Final | Passed | ||
| 10/24/2024 | COT - HCEL - Electrical Final | Passed | ||
| 10/24/2024 | COT - HCBU - Building Final | Passed | ||
| 10/24/2024 | ENGR Engineering Final | Passed | ||
| 10/23/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 11/04/2024 | SITE - Zoning Final | Passed |