Permit: TC-COM-1122-00121
Permit Details
Apply Date:
11/15/2022
Applicant:
Logan Weitzel
Description:
Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Permit Reviews
Permit Number - TC-COM-1122-00121
Permit Status: Complete
Permit Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/31/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/07/2023 | APPROVED |
03/28/2023 | COMMERCIAL REVIEW - FULL v.3 | 04/22/2023 | APPROVED |
11/25/2022 | COMMERCIAL REVIEW - FULL v.1 | 12/23/2022 | REQUIRES RESUBMIT |
09/08/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/12/2023 | APPROVED |
02/08/2023 | COMMERCIAL REVIEW - FULL v.2 | 03/07/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1122-00121
Permit Status: Complete
Permit Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Date | Description | Comments |
---|---|---|
04/10/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
04/10/2023 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
04/10/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/10/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
04/10/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/10/2023 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
04/10/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
04/10/2023 | SIGNAGE Designs must be submitted and approved prior to final. | |
04/10/2023 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
04/10/2023 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
04/10/2023 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
04/10/2023 | WATER STERILIZATION REPORT IS REQUIRED. | |
04/10/2023 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1122-00121
Permite Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/01/2023 | COT - HCME - Mechanical Progress | N/A | Partial Pass | Roof top rough-in of HVAC ductwork is complete. Okay to wrap ductwork with insulation. |
05/12/2023 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | partial approval for under slab rough soil, with floor drains ok to backfill |
05/15/2023 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | partial approval for interior slab pour back, ok to place concrete |
05/23/2023 | COT - HCBU - Interior Shear Bracing | N/A | Not Applicable | |
06/09/2023 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | for in wall ok to one side and exterior walls |
06/13/2023 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | above hard lids |
08/17/2023 | COT - HCPL - Gas Final | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1122-00121
Permit Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Total Completed Inspections - 17
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/15/2023 | COT - HCPL - Rough Soil | Passed | ||
05/17/2023 | COT - HCBU - Masonry Pregrout | Passed | ||
05/25/2023 | COT - HCEL - Electrical Underground | Passed | ||
06/06/2023 | COT - HCBU - Roof Nailing | Passed | ||
06/13/2023 | COT - HCBU - Framing | Passed | ||
06/14/2023 | COT - HCPL - Gas Pressure Test | Passed | ||
06/29/2023 | BULD - Electrical Clearance | Passed | ||
07/13/2023 | COT - HCBU - Building Above Ceiling | Passed | ||
07/13/2023 | COT - HCEL - Electrical Above Ceiling | Passed | ||
07/27/2023 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 7/27/2023 | |
08/01/2023 | COT - HCBU - Building Progress | Passed | ||
08/11/2023 | COT - HCME - Mechanical Above Ceiling | Passed | ||
08/17/2023 | COT - FCON - Fire - Final | Passed | ||
08/17/2023 | COT - HCPL - Plumbing Final | Passed | ||
08/17/2023 | COT - HCME - Mechanical Final | Passed | ||
08/21/2023 | COT - HCBU - Building Final | Passed | recommend C/O | |
08/21/2023 | COT - HCEL - Electrical Final | Passed |