Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
11/09/2022
Applicant:
Isabella n/a
Description:
Interior remodel of existing bakery

Permit Reviews

Permit Number - TC-COM-1122-00083
Permit Status: Issued
Permit Description: Interior remodel of existing bakery
Start Date Submittal Complete Date Status  
11/21/2022 COMMERCIAL REVIEW - FULL v.1 02/02/2023 REQUIRES RESUBMIT Review Details
03/01/2023 COMMERCIAL REVIEW - FULL v.2 03/06/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1122-00083
Permit Status: Issued
Permit Description: Interior remodel of existing bakery
Total Outstanding Activity Conditions - 3
Date Name
03/02/2023 AIR BALANCING REPORT IS REQUIRED.
03/02/2023 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
03/02/2023 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-1122-00083
Permit Status: Issued
Permit Description: Interior remodel of existing bakery
Date Description Comments
03/16/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-1122-00083
Permit Description: Interior remodel of existing bakery
Total Completed Inspections - 16
Date Description Inspector Results Comments
05/31/2023 COT - LCBU - Framing Passed
05/31/2023 COT - LCPL - Plumbing Intermediate Passed
05/31/2023 COT - LCEL - Electrical Intermediate Passed
05/31/2023 COT - LCBU - Preslab Passed
07/25/2023 COT - LCPL - Gas Final Passed
07/25/2023 COT - LCPL - Plumbing Final Passed
07/25/2023 COT - LCME - Mechanical Intermediate Passed
07/25/2023 COT - LCME - Mechanical Final Passed
07/25/2023 COT - LCME - Mechanical Above Ceiling Passed
07/25/2023 COT - LCBU - Building Final Passed
07/25/2023 COT - BULD - SWG Clearance Passed No gas clearance required. Service is currently operational.
07/25/2023 BULD - Electrical Clearance Passed
07/25/2023 COT - LCPL - Gas Pressure Test Passed
07/25/2023 COT - LCEL - Electrical Above Ceiling Passed
07/27/2023 COT - LCEL - Electrical Final Passed
01/16/2024 COT - LCPL - Rough Soil Passed