Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
4831 E 22ND ST
Address NEW:
4831 E 22ND ST
Apply Date:
11/09/2022
Applicant:
Christian Sanchez
Description:
1. NEW PACKAGE HEAT PUMP / HVAC REPLACEMENT & ELECTRICAL REFEED 2. MECHANICAL EQUIPMENT SCREEN WALL WEST OF CHURCH. 3. NEW UNIVERSAL RESTROOMS RECONFIGURATION

Permit Reviews

Permit Number - TC-COM-1122-00081
Permit Status: Complete
Permit Description: 1. NEW PACKAGE HEAT PUMP / HVAC REPLACEMENT & ELECTRICAL REFEED 2. MECHANICAL EQUIPMENT SCREEN WALL WEST OF CHURCH. 3. NEW UNIVERSAL RESTROOMS RECONFIGURATION
Start Date Submittal Complete Date Status  
04/22/2024 COMMERCIAL REVIEW - FULL v.1 06/13/2024 APPROVED Review Details
03/23/2023 COMMERCIAL REVIEW - FULL v.1 05/01/2023 APPROVED Review Details
07/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/16/2024 APPROVED Review Details
11/21/2022 COMMERCIAL REVIEW - FULL v.1 02/14/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-1122-00081
Permit Status: Complete
Permit Description: 1. NEW PACKAGE HEAT PUMP / HVAC REPLACEMENT & ELECTRICAL REFEED 2. MECHANICAL EQUIPMENT SCREEN WALL WEST OF CHURCH. 3. NEW UNIVERSAL RESTROOMS RECONFIGURATION
Date Description Comments
04/30/2024 AIR BALANCING REPORT IS REQUIRED.
05/06/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
05/06/2024 Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1122-00081
Permite Description: 1. NEW PACKAGE HEAT PUMP / HVAC REPLACEMENT & ELECTRICAL REFEED 2. MECHANICAL EQUIPMENT SCREEN WALL WEST OF CHURCH. 3. NEW UNIVERSAL RESTROOMS RECONFIGURATION
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
12/01/2023 COT - HCPL - Rough Soil N/A Not Applicable
03/20/2024 COT - HCPL - Plumbing Above Ceiling N/A Not Applicable Not applicable, restroom remodel has been cancelled by owner.
03/20/2024 COT - HCPL - Plumbing Intermediate N/A Not Applicable Not applicable, restroom remodel has been cancelled by owner.
03/05/2024 COT - HCPL - Gas Pressure Test N/A Not Applicable
04/26/2024 BULD - Electrical Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1122-00081
Permit Description: 1. NEW PACKAGE HEAT PUMP / HVAC REPLACEMENT & ELECTRICAL REFEED 2. MECHANICAL EQUIPMENT SCREEN WALL WEST OF CHURCH. 3. NEW UNIVERSAL RESTROOMS RECONFIGURATION
Total Completed Inspections - 19
Date Description Inspector Results Comments
11/16/2023 COT - HCEL - Electrical Underground Passed
03/20/2024 COT - HCME - Mechanical Intermediate Passed Mechanical equipment and ductwork are complete above ceiling. Okay to proceed with replacement of ceilings in restrooms.
03/20/2024 COT - HCEL - Grounding/Bonding Passed Mechanical equipment and disconnects are properly grounded and bonded.
03/20/2024 COT - HCEL - Electrical Above Ceiling Passed Above ceiling is complete, all j-boxes are properly labeled.
03/20/2024 COT - HCBU - Building Above Ceiling Passed Mechanical and electrical rough-in is complete above ceiling. Okay to proceed with replacement of ceiling in bathrooms.
03/20/2024 COT - HCME - Mechanical Above Ceiling Passed Mechanical equipment and ductwork are complete above ceiling. Okay to proceed with replacement of ceilings in restrooms.
03/26/2024 COT - HCBU - Framing Passed
03/26/2024 COT - HCPL - Gas Pressure Test Passed
03/28/2024 COT - HCEL - Electrical Intermediate Passed
04/01/2024 COT - HCPL - Gas Final Passed
04/01/2024 COT - HCME - Mechanical Final Passed
04/01/2024 COT - HCEL - Electrical Final Passed
04/26/2024 COT - HCBU - Building Final Passed
04/26/2024 COT - HCPL - Plumbing Final Passed
04/26/2024 COT - FCON - Fire - Final Passed
04/26/2024 COT - HCBU - Preslab Passed
05/17/2024 COT - BULD - SWG Clearance Passed
06/21/2024 COT - HCBU - CofO Passed Okay for CofO. 6/21/2024
07/12/2024 SITE - Zoning Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
UNITARIAN UNIVERSALIST CHURCH - FULL REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REVISION 2 - A0.4 - A6.2_V1.PDF DOCUMENTS VIEW
REVISION 2 - LETTER (SIGNED)_V1.PDF DOCUMENTS VIEW
CONS-STANTEC_APPROVED_PLANS_V1.PDF DOCUMENTS VIEW
CONS-UU_PERMIT SET 100PC_V1.PDF DOCUMENTS VIEW
UU CHURCH_PSA (SIGNED)_V1.PDF DOCUMENTS VIEW