Permit: TC-COM-1026-01694
Permit Details
Status:
Needs Resubmittal
Type:
Commercial Building
Address:
4502 S CAMPBELL AV
Address NEW:
4502 S CAMPBELL AV
Apply Date:
10/14/2026
Applicant:
Jelaire Fluit
Description:
Fuel canopy associated with permit TC-COM-0826-01409
Permit Reviews
Permit Number - TC-COM-1026-01694
Permit Status: Needs resubmittal
Permit Description: Fuel canopy associated with permit TC-COM-0826-01409
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/20/2026 | COMMERCIAL REVIEW - FULL v.1 | 11/12/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-1026-01694
Permit Status: Needs resubmittal
Permit Description: Fuel canopy associated with permit TC-COM-0826-01409
Total Outstanding Activity Conditions - 12
| Date | Name |
|---|---|
| 10/20/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
| 10/20/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 11/09/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 11/09/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 11/09/2026 | Obtain ADEQ approval and submit the document prior to issuance of permit. (The state purpose is to protect public health and the environment from releases (i.e., spills, leaks, emissions, etc.) of petroleum and other regulated hazardous substances into groundwater, surface water or soils) |
| 11/09/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 11/09/2026 | Prior to Final - Required Documents - Post-Installed Anchor Inspection Report is required. |
| 11/09/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR REINFORCING STEEL IS REQUIRED. |
| 11/09/2026 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 11/09/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
| 11/09/2026 | SPECIAL INSPECTION FOR STRUCTURAL STEEL FRAMES IS REQUIRED. |
| 11/09/2026 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |