Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address:
1350 S 8TH AV
Address NEW:
1350 S 8TH AV
Apply Date:
10/02/2026
Applicant:
Jazlyn Muzio
Description:
we are re roofing and when we got down to deck it is rotted we need to replace all the 3/4 cdx so we have a solid substrate for reinstall of roofing material

Permit Reviews

Permit Number - TC-COM-1026-01637
Permit Status: Inspections
Permit Description: we are re roofing and when we got down to deck it is rotted we need to replace all the 3/4 cdx so we have a solid substrate for reinstall of roofing material
Start Date Submittal Complete Date Status  
10/09/2026 COMMERCIAL REVIEW - FULL v.1 10/16/2026 REQUIRES RESUBMIT Review Details
10/16/2026 COMMERCIAL REVIEW - FULL v.2 10/16/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-1026-01637
Permit Status: Inspections
Permit Description: we are re roofing and when we got down to deck it is rotted we need to replace all the 3/4 cdx so we have a solid substrate for reinstall of roofing material
Date Description Comments
10/09/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/09/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-1026-01637
Permite Description: we are re roofing and when we got down to deck it is rotted we need to replace all the 3/4 cdx so we have a solid substrate for reinstall of roofing material
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/29/2026 COT - LCBU - Roof Nailing N/A Partial Pass 10/29/2026 Partial pass. Upper deck north half approved. Okay to apply roofing system. Pending lower decks.