Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
10/01/2026
Applicant:
Mark Bostic
Description:
Interior tenant improvement of existing second-floor office space for Tesla, including architectural, electrical, mechanical, lighting, power, HVAC, and related improvements to support a new office layout. No change of use or occupancy.

Permit Reviews

Permit Number - TC-COM-1026-01634
Permit Status: Inspections
Permit Description: Interior tenant improvement of existing second-floor office space for Tesla, including architectural, electrical, mechanical, lighting, power, HVAC, and related improvements to support a new office layout. No change of use or occupancy.
Start Date Submittal Complete Date Status  
10/29/2026 COMMERCIAL REVIEW - FULL v.3 10/30/2026 REQUIRES RESUBMIT Review Details
10/08/2026 COMMERCIAL REVIEW - FULL v.1 10/20/2026 REQUIRES RESUBMIT Review Details
10/22/2026 COMMERCIAL REVIEW - FULL v.2 10/26/2026 REQUIRES RESUBMIT Review Details
10/30/2026 COMMERCIAL REVIEW - FULL v.4 11/02/2026 APPROVED Review Details
11/02/2026 HAST - COMMERCIAL NEW ADD/ALT FAST TRACK v.1 11/02/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1026-01634
Permit Status: Inspections
Permit Description: Interior tenant improvement of existing second-floor office space for Tesla, including architectural, electrical, mechanical, lighting, power, HVAC, and related improvements to support a new office layout. No change of use or occupancy.
Total Outstanding Activity Conditions - 1
Date Name
10/24/2026 Prior to Final - Required Documents - AIR BALANCING REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-1026-01634
Permit Status: Inspections
Permit Description: Interior tenant improvement of existing second-floor office space for Tesla, including architectural, electrical, mechanical, lighting, power, HVAC, and related improvements to support a new office layout. No change of use or occupancy.
Date Description Comments
10/08/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/19/2026 The proposed project consists of an interior tenant improvement with electrical improvements within the existing office space. The work is primarily a like-for-like renovation of the existing tenant space and includes modifications to the existing power systems; installation of new receptacles, floor boxes, power distribution systems, and associated electrical infrastructure serving the existing tenant space; electrical room modifications; minor repairs to the existing standby generator and associated electrical equipment; installation of one new interior door; and minor architectural modifications and finish restoration required to support the electrical improvements.
10/08/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-1026-01634
Permite Description: Interior tenant improvement of existing second-floor office space for Tesla, including architectural, electrical, mechanical, lighting, power, HVAC, and related improvements to support a new office layout. No change of use or occupancy.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
COT - LCEL - Electrical Final N/A Scheduled

Scheduled Inspections

Scheduled Inspections - TC-COM-1026-01634
Status: Inspections
Description: Interior tenant improvement of existing second-floor office space for Tesla, including architectural, electrical, mechanical, lighting, power, HVAC, and related improvements to support a new office layout. No change of use or occupancy.
Scheduled Date Description Entered By Entered Date
11/03/2026 COT - LCEL - Electrical Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .