Permit: TC-COM-1025-01996
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
6100 S 12TH AV
Address NEW:
6100 S 12TH AV
Apply Date:
10/30/2025
Applicant:
lennard legaspi
Description:
Master Plan Set TC-COM-1025-01898/Group of 3 Umbrella Style Shades -1044 SF
Permit Reviews
Permit Number - TC-COM-1025-01996
Permit Status: Inspections complete
Permit Description: Master Plan Set TC-COM-1025-01898/Group of 3 Umbrella Style Shades -1044 SF
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/13/2026 | COMMERCIAL REVIEW - LIMITED v.1 | 01/30/2026 | APPROVED |
| 10/30/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 11/04/2025 | REQUIRES RESUBMIT |
| 12/24/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 01/13/2026 | APPROVED |
Conditions
Permit Number - TC-COM-1025-01996
Permit Status: Inspections complete
Permit Description: Master Plan Set TC-COM-1025-01898/Group of 3 Umbrella Style Shades -1044 SF
| Date | Description | Comments |
|---|---|---|
| 01/13/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 01/13/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/30/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1025-01996
Permit Description: Master Plan Set TC-COM-1025-01898/Group of 3 Umbrella Style Shades -1044 SF
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2026 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 2-6-26: verified the reinforcement/excavation on 3 footings for park shading structures per plans. Okay for concrete placement. | |
| 03/27/2026 | COT - LCBU - Framing | Passed | 3-27-26: framing inspection approved. | |
| 03/31/2026 | ENGR Engineering Final | Passed | 3/31/26 Shade #5-3 Umbrella Shades 20'x20' (South side of Splash Pad) Tallest 14' clear of finish grade.- Correct to Table 1 S4.0 |
|
| 04/01/2026 | COT - LCBU - Building Final | Passed | 4-1-26: building final approved. |