Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
6540 E TANQUE VERDE RD
Apply Date:
10/17/2025
Applicant:
Andrew Adey
Description:
JIMMY'S- TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL BUILDING, THE BUILDING IS TO REMAIN AS IT WITH NO ADDITIONAL SQUARE FOOTAGE ADDED. ALL SITE CONDITIONS ARE TO REMAIN. WORK WILL INCLUDE: ARCHITECTURAL, PLUMBING, MECHANICAL, & ELECTRICAL .

Permit Reviews

Permit Number - TC-COM-1025-01926
Permit Status: Complete
Permit Description: JIMMY'S- TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL BUILDING, THE BUILDING IS TO REMAIN AS IT WITH NO ADDITIONAL SQUARE FOOTAGE ADDED. ALL SITE CONDITIONS ARE TO REMAIN. WORK WILL INCLUDE: ARCHITECTURAL, PLUMBING, MECHANICAL, & ELECTRICAL .
Start Date Submittal Complete Date Status  
06/23/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/25/2026 APPROVED Review Details
11/13/2025 ADMINISTRATIVE v.1 11/13/2025 REQUIRES RESUBMIT Review Details
06/17/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/18/2026 APPROVED Review Details
10/20/2025 COMMERCIAL REVIEW - FULL v.1 11/13/2025 APPROVED Review Details
12/03/2025 ADMINISTRATIVE v.2 12/03/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-1025-01926
Permit Status: Complete
Permit Description: JIMMY'S- TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL BUILDING, THE BUILDING IS TO REMAIN AS IT WITH NO ADDITIONAL SQUARE FOOTAGE ADDED. ALL SITE CONDITIONS ARE TO REMAIN. WORK WILL INCLUDE: ARCHITECTURAL, PLUMBING, MECHANICAL, & ELECTRICAL .
Date Description Comments
11/10/2025 AIR BALANCING AND HOOD PERFORMANCE REPORT IS REQUIRED.
11/13/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/12/2025 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
11/10/2025 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor.
10/20/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/10/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1025-01926
Permite Description: JIMMY'S- TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL BUILDING, THE BUILDING IS TO REMAIN AS IT WITH NO ADDITIONAL SQUARE FOOTAGE ADDED. ALL SITE CONDITIONS ARE TO REMAIN. WORK WILL INCLUDE: ARCHITECTURAL, PLUMBING, MECHANICAL, & ELECTRICAL .
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
01/21/2026 COT - LCBU - Framing N/A Partial Pass Ok to one-side
06/03/2026 COT - LCEL - Electrical Underground N/A Not Applicable
06/03/2026 COT - LCBU - Preslab N/A Not Applicable
06/03/2026 COT - LCEL - Electrical Final N/A Canceled
06/03/2026 BULD - Electrical Clearance N/A Not Applicable
06/03/2026 COT - LCME - Mechanical Intermediate N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1025-01926
Permit Description: JIMMY'S- TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL BUILDING, THE BUILDING IS TO REMAIN AS IT WITH NO ADDITIONAL SQUARE FOOTAGE ADDED. ALL SITE CONDITIONS ARE TO REMAIN. WORK WILL INCLUDE: ARCHITECTURAL, PLUMBING, MECHANICAL, & ELECTRICAL .
Total Completed Inspections - 17
Date Description Inspector Results Comments
01/16/2026 COT - LCPL - Sewer Passed grease trap
01/16/2026 COT - LCPL - Rough Soil Passed
02/04/2026 COT - LCEL - Electrical Intermediate Passed
02/05/2026 COT - LCPL - Plumbing Intermediate Passed
06/03/2026 COT - LCPL - Plumbing Final Passed Passed
06/03/2026 COT - BULD - SWG Clearance Passed Passed CLEARANCE SWG
06/03/2026 COT - LCBU - Framing Passed
06/03/2026 COT - LCPL - Gas Pressure Test Passed Passed
06/03/2026 COT - LCEL - Electrical Final Passed Passed
06/11/2026 COT - FCON - Fire - Final Passed
06/11/2026 COT - FCON - Hood System - Final Passed
06/11/2026 COT - LCBU - Building Final Passed
06/11/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
06/11/2026 TRSP - ROW - Final/Close-Out Passed
06/11/2026 COT - LCEL - Electrical Above Ceiling Passed
06/11/2026 COT - LCME - Mechanical Final Passed
06/11/2026 COT - LCME - Kitchen Hood Passed