Permit: TC-COM-1025-01926
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
6540 E TANQUE VERDE RD
Address NEW:
6540 E TANQUE VERDE RD
Apply Date:
10/17/2025
Applicant:
Andrew Adey
Description:
JIMMY'S- TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL BUILDING, THE BUILDING IS TO REMAIN AS IT WITH NO ADDITIONAL SQUARE FOOTAGE ADDED. ALL SITE CONDITIONS ARE TO REMAIN. WORK WILL INCLUDE: ARCHITECTURAL, PLUMBING, MECHANICAL, & ELECTRICAL .
Permit Reviews
Permit Number - TC-COM-1025-01926
Permit Status: Complete
Permit Description: JIMMY'S- TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL BUILDING, THE BUILDING IS TO REMAIN AS IT WITH NO ADDITIONAL SQUARE FOOTAGE ADDED. ALL SITE CONDITIONS ARE TO REMAIN. WORK WILL INCLUDE: ARCHITECTURAL, PLUMBING, MECHANICAL, & ELECTRICAL .
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/23/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/25/2026 | APPROVED |
| 11/13/2025 | ADMINISTRATIVE v.1 | 11/13/2025 | REQUIRES RESUBMIT |
| 06/17/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/18/2026 | APPROVED |
| 10/20/2025 | COMMERCIAL REVIEW - FULL v.1 | 11/13/2025 | APPROVED |
| 12/03/2025 | ADMINISTRATIVE v.2 | 12/03/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1025-01926
Permit Status: Complete
Permit Description: JIMMY'S- TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL BUILDING, THE BUILDING IS TO REMAIN AS IT WITH NO ADDITIONAL SQUARE FOOTAGE ADDED. ALL SITE CONDITIONS ARE TO REMAIN. WORK WILL INCLUDE: ARCHITECTURAL, PLUMBING, MECHANICAL, & ELECTRICAL .
| Date | Description | Comments |
|---|---|---|
| 11/10/2025 | AIR BALANCING AND HOOD PERFORMANCE REPORT IS REQUIRED. | |
| 11/13/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/12/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 11/10/2025 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 10/20/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/10/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1025-01926
Permite Description: JIMMY'S- TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL BUILDING, THE BUILDING IS TO REMAIN AS IT WITH NO ADDITIONAL SQUARE FOOTAGE ADDED. ALL SITE CONDITIONS ARE TO REMAIN. WORK WILL INCLUDE: ARCHITECTURAL, PLUMBING, MECHANICAL, & ELECTRICAL .
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2026 | COT - LCBU - Framing | N/A | Partial Pass | Ok to one-side |
| 06/03/2026 | COT - LCEL - Electrical Underground | N/A | Not Applicable | |
| 06/03/2026 | COT - LCBU - Preslab | N/A | Not Applicable | |
| 06/03/2026 | COT - LCEL - Electrical Final | N/A | Canceled | |
| 06/03/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 06/03/2026 | COT - LCME - Mechanical Intermediate | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1025-01926
Permit Description: JIMMY'S- TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL BUILDING, THE BUILDING IS TO REMAIN AS IT WITH NO ADDITIONAL SQUARE FOOTAGE ADDED. ALL SITE CONDITIONS ARE TO REMAIN. WORK WILL INCLUDE: ARCHITECTURAL, PLUMBING, MECHANICAL, & ELECTRICAL .
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2026 | COT - LCPL - Sewer | Passed | grease trap | |
| 01/16/2026 | COT - LCPL - Rough Soil | Passed | ||
| 02/04/2026 | COT - LCEL - Electrical Intermediate | Passed | ||
| 02/05/2026 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 06/03/2026 | COT - LCPL - Plumbing Final | Passed | Passed | |
| 06/03/2026 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG | |
| 06/03/2026 | COT - LCBU - Framing | Passed | ||
| 06/03/2026 | COT - LCPL - Gas Pressure Test | Passed | Passed | |
| 06/03/2026 | COT - LCEL - Electrical Final | Passed | Passed | |
| 06/11/2026 | COT - FCON - Fire - Final | Passed | ||
| 06/11/2026 | COT - FCON - Hood System - Final | Passed | ||
| 06/11/2026 | COT - LCBU - Building Final | Passed | ||
| 06/11/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 06/11/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 06/11/2026 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 06/11/2026 | COT - LCME - Mechanical Final | Passed | ||
| 06/11/2026 | COT - LCME - Kitchen Hood | Passed |