Permit Details

Status:
Inspections
Type:
Commercial Building
Address:
934 S 6TH AV
Address NEW:
934 S 6TH AV
Apply Date:
10/17/2025
Applicant:
JR Durazo
Description:
PARTIAL TENANT RENOVATION OF EXISTING OFFICE. ADDITION OF BATHROOM AND BREAKROOM. NO CHANGE OF USE AND NO EXPANSION.

Permit Reviews

Permit Number - TC-COM-1025-01925
Permit Status: Inspections
Permit Description: PARTIAL TENANT RENOVATION OF EXISTING OFFICE. ADDITION OF BATHROOM AND BREAKROOM. NO CHANGE OF USE AND NO EXPANSION.
Start Date Submittal Complete Date Status  
10/20/2025 COMMERCIAL REVIEW - FULL v.1 11/10/2025 REQUIRES RESUBMIT Review Details
02/02/2026 COMMERCIAL REVIEW - FULL REVISION v.1 02/02/2026 APPROVED Review Details
12/30/2025 ADMINISTRATIVE v.1 12/30/2025 REQUIRES RESUBMIT Review Details
12/04/2025 COMMERCIAL REVIEW - FULL v.2 01/02/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1025-01925
Permit Status: Inspections
Permit Description: PARTIAL TENANT RENOVATION OF EXISTING OFFICE. ADDITION OF BATHROOM AND BREAKROOM. NO CHANGE OF USE AND NO EXPANSION.
Total Outstanding Activity Conditions - 2
Date Name
12/30/2025 AIR BALANCING REPORT IS REQUIRED.
12/30/2025 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-1025-01925
Permit Status: Inspections
Permit Description: PARTIAL TENANT RENOVATION OF EXISTING OFFICE. ADDITION OF BATHROOM AND BREAKROOM. NO CHANGE OF USE AND NO EXPANSION.
Date Description Comments
10/20/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/20/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-1025-01925
Permite Description: PARTIAL TENANT RENOVATION OF EXISTING OFFICE. ADDITION OF BATHROOM AND BREAKROOM. NO CHANGE OF USE AND NO EXPANSION.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
02/05/2026 COT - HCPL - Sewer N/A Partial Pass Partial pass. West end of building from (partition wall). Okay to backfill progress areas. Shading required. 2/5/2026
04/28/2026 COT - HCME - Mechanical Intermediate N/A Canceled
05/13/2026 COT - HCBU - Interior Shear Bracing N/A Partial Pass Partial pass. All walls approved. Pending hard lid areas. 5/13/2026
07/30/2026 COT - HCBU - Building Above Ceiling N/A Not Ready 7-30-26: we will inspect (rooftop) at finals.
07/30/2026 COT - HCEL - Electrical Above Ceiling N/A Partial Pass 7-30-26: label above ceiling junction boxes at room's 107, 102/104, 115. Electrical above ceiling at 106, 108, 110, 112, 113, 109, 114, 120 approved. Okay to continue with construction at progress areas. We will verify labeling at upcoming inspection or at finals.
07/30/2026 COT - HCME - Mechanical Above Ceiling N/A Partial Pass 7-30-26: mechanical above ceiling at room's 107, 102/104, 115, 106, 108, 110, 112, 113, 109, 114, 120 approved. Okay to continue with construction at progress areas.
07/30/2026 COT - HCPL - Plumbing Above Ceiling N/A Partial Pass 7-30-26: plumbing above ceiling at room's 107, 102/104, 115, 106, 108, 110, 112, 113, 109, 114, 120 approved. Okay to continue with construction at progress areas.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-1025-01925
Permit Description: PARTIAL TENANT RENOVATION OF EXISTING OFFICE. ADDITION OF BATHROOM AND BREAKROOM. NO CHANGE OF USE AND NO EXPANSION.
Total Completed Inspections - 9
Date Description Inspector Results Comments
02/24/2026 COT - HCBU - Preslab Passed Interior slab areas and exterior equipment pad. Ok to place concrete in progress areas.
03/26/2026 COT - HCPL - Rough Soil Passed
04/28/2026 COT - HCBU - Framing Passed
04/28/2026 COT - HCEL - Electrical Intermediate Passed
04/28/2026 COT - HCPL - Plumbing Intermediate Passed
04/28/2026 COT - HCME - Venting Passed
04/28/2026 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
05/05/2026 COT - HCEL - Electrical Underground Passed Floor receptacles approved. Okay to backfill. Shading required. 5/5/2026
05/05/2026 COT - HCPL - Plumbing Progress Passed Main water line inspection approved. Okay to backfill. Shading required. 5/5/2026

Documents

File Name Document Type  
1_CD RAH DURAZO SYSTEMS DESIGN REPORT_V1.PDF DOCUMENTS VIEW
2_PERMIT RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
CONS-2_CD-RAH DURAZO_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
1_CD RAH DURAZO SYSTEMS DESIGN REPORT_V1.PDF DOCUMENTS VIEW
1_CD- RAH DURAZO OFFICE TI WILLDAN PSA - SIGNED_V1.PDF DOCUMENTS VIEW
2_PERMIT RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
CONS-2_CD-RAH DURAZO_V2.PDF DOCUMENTS VIEW