Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
10/14/2025
Applicant:
Christine Murrell
Description:
Install new pallet racking as per layout and Phase #1

Permit Reviews

Permit Number - TC-COM-1025-01904
Permit Status: Issued
Permit Description: Install new pallet racking as per layout and Phase #1
Start Date Submittal Complete Date Status  
07/28/2026 SPECIAL INSPECTION REVIEW v.1 07/28/2026 REQUIRES RESUBMIT Review Details
11/17/2025 RESTAMP - COMMERCIAL v.1 11/20/2025 APPROVED Review Details
08/31/2026 SPECIAL INSPECTION REVIEW v.2 09/02/2026 APPROVED Review Details
11/10/2025 COMMERCIAL REVIEW - FULL v.2 11/17/2025 APPROVED Review Details
11/21/2025 ADMINISTRATIVE v.1 11/21/2025 REQUIRES RESUBMIT Review Details
07/27/2026 SPECIAL INSPECTION REVIEW v.1 N/A REQUIRES RESUBMIT Review Details
12/01/2025 COMMERCIAL REVIEW - FULL v.2 12/03/2025 APPROVED Review Details
12/01/2025 ADMINISTRATIVE v.2 12/03/2025 APPROVED Review Details
11/21/2025 COMMERCIAL REVIEW - FULL v.1 11/21/2025 REQUIRES RESUBMIT Review Details
10/15/2025 COMMERCIAL REVIEW - FULL v.1 11/06/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-1025-01904
Permit Status: Issued
Permit Description: Install new pallet racking as per layout and Phase #1
Date Description Comments
10/15/2025 Plans have #115 and Permit Application has #151. Correct suite number must be assigned to the Permit Application and Plans. Please submit approved plans without City stamps include correct suite number. Along with a comment review letter, stating that this is a re-stamp to resolve the addressing issue
11/14/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/06/2025 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
10/15/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/21/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/06/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-1025-01904
Permite Description: Install new pallet racking as per layout and Phase #1
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/09/2025 COT - LCBU - Building Final N/A Partial Pass 12-9-25: partial pass on building final.
Pending phase 2 framing for racking system.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-1025-01904
Permit Description: Install new pallet racking as per layout and Phase #1
Total Completed Inspections - 5
Date Description Inspector Results Comments
12/09/2025 COT - FCON - Fire - Final Passed
12/09/2025 COT - FCON - Sprinkler - Final Passed
12/09/2025 ENGR Engineering Final Passed
07/20/2026 COT - LCBU - Building Final Passed 7-20-26: Building Final on Phase 1 racking system approved.
Note: see pending condition. Condition must be satisfied to issue C of O. Okay to apply for a Level 4 TCO if you haven't done so.
07/20/2026 COT - LCBU - Framing Passed 7-20-26: Framing on Phase 1 approved.