Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-1024-02085
Permit Details
Status:
In Revision
Type:
Commercial Building
Address:
7160 E BROADWAY BL
Address NEW:
7160 E BROADWAY BL
Apply Date:
10/30/2024
Applicant:
Allison Blakeslee
Description:
INTERIOR TENANT IMPROVEMENTS AND EXTERIOR FACADE REFRESH OF AN EXISTING 21,511 SQ.FT., 1 STORY TENANT SPACE. EXISTING SHELL BUILDING IS EXTERIOR CMU BEARING WALL AND WOOD FRAME CONSTRUCTION, AND IS FULLY SPRINKLERED.
Permit Reviews
Permit Number - TC-COM-1024-02085
Permit Status: In revision
Permit Description: INTERIOR TENANT IMPROVEMENTS AND EXTERIOR FACADE REFRESH OF AN EXISTING 21,511 SQ.FT., 1 STORY
TENANT SPACE. EXISTING SHELL BUILDING IS EXTERIOR CMU BEARING WALL AND WOOD FRAME
CONSTRUCTION, AND IS FULLY SPRINKLERED.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/06/2025 | COMMERCIAL REVIEW - FULL REVISION v.2 | 06/23/2025 | APPROVED |
| 11/26/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 12/18/2025 | REQUIRES RESUBMIT |
| 04/21/2025 | RESTAMP - COMMERCIAL v.1 | 04/23/2025 | APPROVED |
| 11/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/19/2025 | APPROVED |
| 01/14/2025 | COMMERCIAL REVIEW - FULL v.2 | 02/04/2025 | REQUIRES RESUBMIT |
| 12/19/2025 | COMMERCIAL REVIEW - FULL REVISION v.2 | N/A | IN REVIEW |
| 11/12/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/12/2025 | REQUIRES RESUBMIT |
| 10/31/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/26/2024 | REQUIRES RESUBMIT |
| 05/01/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/06/2025 | APPROVED |
| 06/06/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 06/06/2025 | REQUIRES RESUBMIT |
| 04/07/2025 | COMMERCIAL REVIEW - FULL v.3 | 04/21/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-1024-02085
Permit Status: In revision
Permit Description: INTERIOR TENANT IMPROVEMENTS AND EXTERIOR FACADE REFRESH OF AN EXISTING 21,511 SQ.FT., 1 STORY
TENANT SPACE. EXISTING SHELL BUILDING IS EXTERIOR CMU BEARING WALL AND WOOD FRAME
CONSTRUCTION, AND IS FULLY SPRINKLERED.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/23/2025 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
| 01/23/2025 | Masonry Inspection Report submittal review is required. |
Conditions
Permit Number - TC-COM-1024-02085
Permit Status: In revision
Permit Description: INTERIOR TENANT IMPROVEMENTS AND EXTERIOR FACADE REFRESH OF AN EXISTING 21,511 SQ.FT., 1 STORY
TENANT SPACE. EXISTING SHELL BUILDING IS EXTERIOR CMU BEARING WALL AND WOOD FRAME
CONSTRUCTION, AND IS FULLY SPRINKLERED.
| Date | Description | Comments |
|---|---|---|
| 01/23/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/23/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 01/23/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 01/23/2025 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 01/14/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/23/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: In Revision
Permit Number: TC-COM-1024-02085
Permite Description: INTERIOR TENANT IMPROVEMENTS AND EXTERIOR FACADE REFRESH OF AN EXISTING 21,511 SQ.FT., 1 STORY
TENANT SPACE. EXISTING SHELL BUILDING IS EXTERIOR CMU BEARING WALL AND WOOD FRAME
CONSTRUCTION, AND IS FULLY SPRINKLERED.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 05/08/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 06/17/2025 | COT - HCBU - Building Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: In Revision
Permit Number: TC-COM-1024-02085
Permit Description: INTERIOR TENANT IMPROVEMENTS AND EXTERIOR FACADE REFRESH OF AN EXISTING 21,511 SQ.FT., 1 STORY
TENANT SPACE. EXISTING SHELL BUILDING IS EXTERIOR CMU BEARING WALL AND WOOD FRAME
CONSTRUCTION, AND IS FULLY SPRINKLERED.
Total Completed Inspections - 24
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2025 | COT - HCPL - Plumbing Progress | Passed | ||
| 05/08/2025 | COT - HCBU - Framing | Passed | ||
| 05/08/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 05/08/2025 | COT - HCPL - Rough Soil | Passed | ||
| 05/22/2025 | COT - HCEL - Electrical Intermediate | Passed | Underground conduit for our security system at the entrance. | |
| 06/17/2025 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 06/17/2025 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 06/17/2025 | COT - HCBU - Building Above Ceiling | Passed | ||
| 07/02/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 07/02/2025 | COT - HCME - Mechanical Final | Passed | 7-2-25: mechanical final approved. | |
| 07/02/2025 | COT - HCEL - Electrical Final | Passed | 7-2-25: electrical final approved. | |
| 07/08/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 07/17/2025 | ENGR Engineering Final | Passed | 7/17/25 Okay for level 2 TCO Exits are safe and Accessiblity is good. 1 dumpster is scheduled for removal for tomorrow. Contractor will provide picture. |
|
| 07/21/2025 | COT - HCME - Mechanical Intermediate | Passed | ||
| 07/21/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 07/21/2025 | COT - HCME - Mechanical Progress | Passed | ||
| 07/21/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 07/21/2025 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 07/21/2025 | COT - HCBU - Building Progress | Passed | ||
| 07/22/2025 | COT - HCBU - Building Final | Passed | ||
| 07/22/2025 | COT - HCBU - TCO | Passed | ||
| 07/22/2025 | COT - FCON - Alarm - Final | Passed | ||
| 07/22/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 11/05/2025 | COT - FCON - Fire - Final | Passed |