Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
405 W SPEEDWAY BL
Apply Date:
10/29/2024
Applicant:
ATUL JAIN
Description:
Add Canopy Installation for Gas dispensers

Permit Reviews

Permit Number - TC-COM-1024-02083
Permit Status: Complete
Permit Description: Add Canopy Installation for Gas dispensers
Start Date Submittal Complete Date Status  
12/02/2024 COMMERCIAL REVIEW - LIMITED v.2 12/09/2024 APPROVED Review Details
12/09/2024 RESTAMP - COMMERCIAL v.1 12/17/2024 APPROVED Review Details
01/08/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/10/2025 APPROVED Review Details
10/30/2024 COMMERCIAL REVIEW - LIMITED v.1 11/25/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-1024-02083
Permit Status: Complete
Permit Description: Add Canopy Installation for Gas dispensers
Date Description Comments
10/30/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1024-02083
Permite Description: Add Canopy Installation for Gas dispensers
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/23/2025 ENGR Engineering Final N/A Partial Pass Contractor called me in for consultation needed some information about the subgrade in the AB grade. I informed him that we needed to get 95% on the subgrade and 100% on the AB.
04/15/2025 COT - LCBU - Building Final N/A Partial Pass Need to complete parapet wall coverings of canopy.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1024-02083
Permit Description: Add Canopy Installation for Gas dispensers
Total Completed Inspections - 5
Date Description Inspector Results Comments
04/14/2025 TRSP - ROW - Final/Close-Out Passed
04/15/2025 COT - LCBU - Excavation/Rebar/Zoning Passed
09/23/2025 COT - FCON - Fire - Final Passed
10/24/2025 ENGR Engineering Final Passed
10/24/2025 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CHEVRON MAIN SPEEDWAY COT LETTER FOR SPECIAL INSPECTION_V1.PDF DOCUMENTS VIEW
CHEVRON MAIN SPEEDWAY CORREDTED DRAWINGS 112124_V1.PDF DOCUMENTS VIEW