Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-1024-02063
Permit Details
Apply Date:
10/27/2024
Applicant:
Denny Hawkins
Description:
Install new 200amp single phase meter base and panel with 200amp main breaker. This will be a like for like change, existing meter base is going bad. We will use existing ufer ground. There is no new loads being added, 120/240volt single phase 200amp is existing.
Permit Reviews
Permit Number - TC-COM-1024-02063
Permit Status: Inspections complete
Permit Description: Install new 200amp single phase meter base and panel with 200amp main breaker. This will be a like for like change, existing meter base is going bad. We will use existing ufer ground. There is no new loads being added, 120/240volt single phase 200amp is existing.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/28/2024 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 10/29/2024 | APPROVED |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1024-02063
Permit Description: Install new 200amp single phase meter base and panel with 200amp main breaker. This will be a like for like change, existing meter base is going bad. We will use existing ufer ground. There is no new loads being added, 120/240volt single phase 200amp is existing.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/31/2024 | BULD - Electrical Clearance | Passed | Approved 200A service panel upgrade - INCR Clearance to TEP is required for the electrical cutover | |
11/21/2024 | COT - LCEL - Electrical Final | Passed |