Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address:
665 N SWAN RD
Apply Date:
10/27/2024
Applicant:
Denny Hawkins
Description:
Install new 200amp single phase meter base and panel with 200amp main breaker. This will be a like for like change, existing meter base is going bad. We will use existing ufer ground. There is no new loads being added, 120/240volt single phase 200amp is existing.

Permit Reviews

Permit Number - TC-COM-1024-02063
Permit Status: Inspections complete
Permit Description: Install new 200amp single phase meter base and panel with 200amp main breaker. This will be a like for like change, existing meter base is going bad. We will use existing ufer ground. There is no new loads being added, 120/240volt single phase 200amp is existing.
Start Date Submittal Complete Date Status  
10/28/2024 COMMERCIAL PDSD SIMPLE REVIEW v.1 10/29/2024 APPROVED Review Details

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-1024-02063
Permit Description: Install new 200amp single phase meter base and panel with 200amp main breaker. This will be a like for like change, existing meter base is going bad. We will use existing ufer ground. There is no new loads being added, 120/240volt single phase 200amp is existing.
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/31/2024 BULD - Electrical Clearance Passed Approved 200A service panel upgrade - INCR Clearance to TEP is required for the electrical cutover
11/21/2024 COT - LCEL - Electrical Final Passed

Documents

File Name Document Type  
665 N SWAN RD SITE PLAN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW