Permit: TC-COM-1024-02057
Permit Details
Apply Date:
10/24/2024
Applicant:
Earl Yousey
Description:
Interior TI for Church
Permit Reviews
Permit Number - TC-COM-1024-02057
Permit Status: Inspections
Permit Description: Interior TI for Church
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/16/2025 | COMMERCIAL REVIEW - FULL v.3 | 01/21/2025 | APPROVED |
12/14/2024 | COMMERCIAL REVIEW - FULL v.2 | 01/10/2025 | REQUIRES RESUBMIT |
10/28/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/24/2024 | REQUIRES RESUBMIT |
01/21/2025 | RESTAMP - COMMERCIAL v.1 | 01/24/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-1024-02057
Permit Status: Inspections
Permit Description: Interior TI for Church
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
01/21/2025 | AIR BALANCING REPORT IS REQUIRED. |
01/21/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-1024-02057
Permit Status: Inspections
Permit Description: Interior TI for Church
Date | Description | Comments |
---|---|---|
01/24/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
12/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-1024-02057
Permite Description: Interior TI for Church
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/03/2025 | COT - HCBU - Sustainability | N/A | Not Applicable | |
04/03/2025 | COT - HCME - Venting | N/A | Not Applicable | |
04/22/2025 | COT - HCPL - Plumbing Progress | N/A | Not Ready | wanted yard water line |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-1024-02057
Permit Description: Interior TI for Church
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/02/2025 | COT - HCPL - Rough Soil | Passed | ||
04/16/2025 | PDSD Building Division - Site Excavation/Layout/Rebar | Passed | ||
04/16/2025 | COT - HCBU - Building Progress | Passed | ||
04/22/2025 | COT - HCPL - Yard Water Line | Passed |