Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
In Review
Type:
Commercial Building
Apply Date:
10/22/2024
Applicant:
Holly Damerell
Description:
Interior Fit Ups Unit 180 - This project consists of interior improvements on behalf of El Rio Health for Meridian Property Company, for the renovation of an existing 2 story, 91,758 sf building for an El Rio Health Clinic. The project includes clinic and exam spaces in addition to a pharmacy and pharmacy mail room. There will be two suites within the same building, suite 120 (overall building) and suite 180 (pharmacy mail room). The interior demolition scope and site components have been submitted under separate permit TC-COM-0824-01622 and TD-DEV-0824-00238. Addressing components have been approved under separate permit P24AD00654.

Permit Reviews

Permit Number - TC-COM-1024-02031
Permit Status: In review
Permit Description: Interior Fit Ups Unit 180 - This project consists of interior improvements on behalf of El Rio Health for Meridian Property Company, for the renovation of an existing 2 story, 91,758 sf building for an El Rio Health Clinic. The project includes clinic and exam spaces in addition to a pharmacy and pharmacy mail room. There will be two suites within the same building, suite 120 (overall building) and suite 180 (pharmacy mail room). The interior demolition scope and site components have been submitted under separate permit TC-COM-0824-01622 and TD-DEV-0824-00238. Addressing components have been approved under separate permit P24AD00654.
Start Date Submittal Complete Date Status  
12/05/2024 COMMERCIAL REVIEW - FULL v.2 N/A IN REVIEW Review Details
10/25/2024 COMMERCIAL REVIEW - FULL v.1 11/21/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1024-02031
Permit Status: In review
Permit Description: Interior Fit Ups Unit 180 - This project consists of interior improvements on behalf of El Rio Health for Meridian Property Company, for the renovation of an existing 2 story, 91,758 sf building for an El Rio Health Clinic. The project includes clinic and exam spaces in addition to a pharmacy and pharmacy mail room. There will be two suites within the same building, suite 120 (overall building) and suite 180 (pharmacy mail room). The interior demolition scope and site components have been submitted under separate permit TC-COM-0824-01622 and TD-DEV-0824-00238. Addressing components have been approved under separate permit P24AD00654.
Total Outstanding Activity Conditions - 7
Date Name
12/18/2024 AIR BALANCING REPORT IS REQUIRED.
12/18/2024 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
12/18/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
12/18/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/18/2024 Masonry Inspection Report submittal review is required.
12/18/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.