Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-1024-01972
Permit Details
Apply Date:
10/14/2024
Applicant:
Andrew Venne
Description:
Tenant improvement
Permit Reviews
Permit Number - TC-COM-1024-01972
Permit Status: Issued
Permit Description: Tenant improvement
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/15/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 12/02/2024 | APPROVED |
| 10/17/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 11/06/2024 | REQUIRES RESUBMIT |
| 12/02/2024 | RESTAMP - COMMERCIAL v.1 | 12/06/2024 | APPROVED |
| 05/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/09/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1024-01972
Permit Status: Issued
Permit Description: Tenant improvement
| Date | Description | Comments |
|---|---|---|
| 11/04/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 11/15/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/25/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-1024-01972
Permite Description: Tenant improvement
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - FCON - Fire - Final | N/A | Not Ready | ||
| COT - FCON - Sprinkler - Final | N/A | Not Ready | ||
| 04/25/2025 | ENGR Engineering Final | N/A | Not Ready | Front of building needs address numbers before Engineering Final can be compete. Dumpster in rear is okay as it doesn’t impact the public entrance. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-1024-01972
Permit Description: Tenant improvement
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2025 | COT - BULD - SWG Clearance | Passed | Approved existing gas line and pressure test - SWG Clearance is required for reconnection | |
| 04/14/2025 | BULD - Electrical Clearance | Passed | n/a | |
| 04/14/2025 | COT - LCEL - Electrical Above Ceiling | Passed | Approved per Burge on March 20th. 4/14/2025 | |
| 04/14/2025 | COT - LCPL - Plumbing Intermediate | Passed | Approved by Burge on March 20th. 4/14/2025 | |
| 04/14/2025 | COT - LCEL - Electrical Intermediate | Passed | Approved by Burge on March 20th. 4/14/2025 | |
| 04/16/2025 | COT - LCME - Mechanical Intermediate | Passed | Approved. 4/16/2025 | |
| 04/25/2025 | COT - LCME - Mechanical Final | Passed | ||
| 04/29/2025 | COT - LCEL - Electrical Final | Passed | ||
| 04/29/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 04/29/2025 | ENGR Engineering Final | Passed | ||
| 05/05/2025 | COT - LCBU - Building Final | Passed |