Permit Details

Status:
In Revision
Type:
Commercial Building
Address NEW:
1305 S ALVERNON WY
Apply Date:
10/10/2024
Applicant:
Kyle Danielson
Description:
Remodel existing structure for vehicle collision repair center

Permit Reviews

Permit Number - TC-COM-1024-01955
Permit Status: In revision
Permit Description: Remodel existing structure for vehicle collision repair center
Start Date Submittal Complete Date Status  
11/19/2024 COMMERCIAL REVIEW - FULL v.2 12/06/2024 REQUIRES RESUBMIT Review Details
12/09/2024 COMMERCIAL REVIEW - FULL v.3 01/07/2025 REQUIRES RESUBMIT Review Details
10/14/2024 COMMERCIAL REVIEW - FULL v.1 10/31/2024 REQUIRES RESUBMIT Review Details
01/27/2025 COMMERCIAL REVIEW - FULL v.4 02/05/2025 APPROVED Review Details
02/05/2025 RESTAMP - COMMERCIAL v.1 02/07/2025 APPROVED Review Details
12/09/2025 COMMERCIAL REVIEW - FULL REVISION v.2 01/06/2026 REQUIRES RESUBMIT Review Details
02/11/2026 RESTAMP - COMMERCIAL v.1 02/12/2026 APPROVED Review Details
09/04/2026 COMMERCIAL REVIEW - FULL REVISION v.1 N/A IN REVIEW Review Details
10/10/2025 COMMERCIAL REVIEW - FULL REVISION v.1 11/14/2025 REQUIRES RESUBMIT Review Details
02/05/2026 COMMERCIAL REVIEW - FULL REVISION v.3 02/11/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1024-01955
Permit Status: In revision
Permit Description: Remodel existing structure for vehicle collision repair center
Total Outstanding Activity Conditions - 8
Date Name
01/06/2026 Prior to project being finalized, development package TD-DEV-1025-00255, must be in approved status showing the disposition/new location for the parking spaces to be removed on this building permit.
01/29/2025 AIR BALANCING REPORT IS REQUIRED.
01/29/2025 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
01/29/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/29/2025 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
01/29/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
01/29/2025 WATER STERILIZATION REPORT IS REQUIRED.
01/29/2025 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.

Conditions

Permit Number - TC-COM-1024-01955
Permit Status: In revision
Permit Description: Remodel existing structure for vehicle collision repair center
Date Description Comments
08/29/2025 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
02/07/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
12/09/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/29/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: In Revision
Permit Number: TC-COM-1024-01955
Permite Description: Remodel existing structure for vehicle collision repair center
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/28/2026 COT - HCBU - Preslab N/A Partial Pass Partial pass, progress area in paint booth.
08/07/2026 COT - HCBU - Framing N/A Partial Pass 8.7.26
Framing on the south end, and northwest compressor room.

Completed Inspections

Permit Status: In Revision
Permit Number: TC-COM-1024-01955
Permit Description: Remodel existing structure for vehicle collision repair center
Total Completed Inspections - 5
Date Description Inspector Results Comments
08/07/2026 COT - HCEL - Electrical Progress Passed
08/07/2026 COT - HCPL - Plumbing Progress Passed
08/12/2026 COT - HCBU - Stem Wall/Retaining Wall Passed
08/12/2026 COT - HCBU - Sustainability Passed
08/31/2026 COT - HCBU - Excavation/Rebar/Zoning Passed 8-31-26: reinforcement/excavation at pit/slab on grade verified per S201/A. Okay for concrete placement.