Permit: TC-COM-1024-01938
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
1755 W VALENCIA RD
Address NEW:
1755 W VALENCIA RD
Apply Date:
10/07/2024
Applicant:
Rachel Meyer
Description:
Interior alteration (new flooring, paint, furniture), construction new full wall partition.
Permit Reviews
Permit Number - TC-COM-1024-01938
Permit Status: Inspections complete
Permit Description: Interior alteration (new flooring, paint, furniture), construction new full wall partition.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/26/2024 | COMMERCIAL REVIEW - FULL v.3 | 11/27/2024 | REQUIRES RESUBMIT |
| 12/06/2024 | COMMERCIAL REVIEW - FULL v.4 | 12/06/2024 | REQUIRES RESUBMIT |
| 12/17/2024 | RESTAMP - COMMERCIAL v.1 | 01/08/2025 | APPROVED |
| 10/11/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/19/2024 | REQUIRES RESUBMIT |
| 12/14/2024 | COMMERCIAL REVIEW - FULL v.5 | 12/17/2024 | APPROVED |
| 11/20/2024 | COMMERCIAL REVIEW - FULL v.2 | 11/20/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-1024-01938
Permit Status: Inspections complete
Permit Description: Interior alteration (new flooring, paint, furniture), construction new full wall partition.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/17/2024 | AIR BALANCING REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-1024-01938
Permit Status: Inspections complete
Permit Description: Interior alteration (new flooring, paint, furniture), construction new full wall partition.
| Date | Description | Comments |
|---|---|---|
| 01/08/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1024-01938
Permite Description: Interior alteration (new flooring, paint, furniture), construction new full wall partition.
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2025 | BULD - Electrical Clearance | N/A | Not Applicable | 2-12-25, not applicable |
| 02/12/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 2-12-25, not applicable |
| 02/12/2025 | COT - HCEL - Grounding/Bonding | N/A | Not Applicable | 2-12-25, not applicable |
| 02/12/2025 | COT - HCEL - Electrical Final | N/A | Re-inspection required | 2-12-25, all renovations and alterations were made without any inspections. Have a licensed contractor submit letters to the city for review/approval for all covered work stating that all construction was completed per approved plans and meets the 2018 International Building Code. This must be approved together with conditions prior to issuing a C of O. |
| 02/12/2025 | COT - HCBU - Framing | N/A | Re-inspection required | 2-12-25, all renovations and alterations were made without any inspections. Have a licensed contractor submit letters to the city for review/approval for all covered work stating that all construction was completed per approved plans and meets the 2018 International Building Code. This must be approved together with conditions prior to issuing a C of O. |
| 02/12/2025 | COT - HCBU - Building Above Ceiling | N/A | Re-inspection required | 2-12-25, all renovations and alterations were made without any inspections. Have a licensed contractor submit letters to the city for review/approval for all covered work stating that all construction was completed per approved plans and meets the 2018 International Building Code. This must be approved together with conditions prior to issuing a C of O. |
| 02/12/2025 | COT - HCBU - Building Final | N/A | Re-inspection required | 2-12-25, all renovations and alterations were made without any inspections. Have a licensed contractor submit letters to the city for review/approval for all covered work stating that all construction was completed per approved plans and meets the 2018 International Building Code. This must be approved together with conditions prior to issuing a C of O. |
| 02/12/2025 | COT - HCBU - Building Progress | N/A | Re-inspection required | 2-12-25, all renovations and alterations were made without any inspections. Have a licensed contractor submit letters to the city for review/approval for all covered work stating that all construction was completed per approved plans and meets the 2018 International Building Code. This must be approved together with conditions prior to issuing a C of O. |
| 02/12/2025 | COT - HCEL - Electrical Above Ceiling | N/A | Re-inspection required | 2-12-25, all renovations and alterations were made without any inspections. Have a licensed contractor submit letters to the city for review/approval for all covered work stating that all construction was completed per approved plans and meets the 2018 International Building Code. This must be approved together with conditions prior to issuing a C of O. |
| 02/12/2025 | COT - FCON - Fire - Final | N/A | Re-inspection required | There is an exit door on the east side of the building next to the bank tellers that has a keyed lock. This needs to be a thumb turn lock. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1024-01938
Permit Description: Interior alteration (new flooring, paint, furniture), construction new full wall partition.
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2025 | ENGR Engineering Final | Passed | No exterior work completed, all materials have been removed, no dumpster or port a jon on site. | |
| 02/12/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 02/12/2025 | COT - HCEL - Electrical Progress | Passed | 2-12-25, approved | |
| 02/24/2025 | COT - HCEL - Electrical Final | Passed | 2-24-25, electrical final approved. | |
| 02/24/2025 | COT - HCBU - Framing | Passed | 2-24-25, framing inspection approved. | |
| 02/24/2025 | COT - HCBU - Building Above Ceiling | Passed | 2-24-25, approved | |
| 02/24/2025 | COT - HCBU - Building Final | Passed | 2-24-25, building final approved. | |
| 02/24/2025 | COT - HCBU - Building Progress | Passed | 2-24-25, building progress inspection approved. | |
| 02/24/2025 | COT - HCEL - Electrical Above Ceiling | Passed | 2-24-25, electrical above ceiling approved | |
| 03/26/2025 | COT - FCON - Fire - Final | Passed |