Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
10/30/2023
Applicant:
Annette Suarez
Description:
8,948 S.F. T.I. IN A VACANT EXISTING BUILDING

Permit Reviews

Permit Number - TC-COM-1023-02541
Permit Status: Complete
Permit Description: 8,948 S.F. T.I. IN A VACANT EXISTING BUILDING
Start Date Submittal Complete Date Status  
11/03/2023 COMMERCIAL REVIEW - FULL v.1 11/22/2023 REQUIRES RESUBMIT Review Details
12/15/2023 COMMERCIAL REVIEW - FULL v.2 12/18/2023 APPROVED Review Details
01/23/2024 RESTAMP - COMMERCIAL v.1 01/24/2024 APPROVED Review Details
12/18/2023 RESTAMP - COMMERCIAL v.1 12/19/2023 APPROVED Review Details
04/01/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/02/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-1023-02541
Permit Status: Complete
Permit Description: 8,948 S.F. T.I. IN A VACANT EXISTING BUILDING
Date Description Comments
11/03/2023 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
11/03/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
04/01/2024 WATER STERILIZATION REPORT IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1023-02541
Permit Description: 8,948 S.F. T.I. IN A VACANT EXISTING BUILDING
Total Completed Inspections - 19
Date Description Inspector Results Comments
02/05/2024 COT - HCBU - Preslab Passed Underground ground plumbing is complete and under a water test with no leaks in the system. Okay to backfill trenches and pour back concrete patch.
02/16/2024 COT - HCPL - Plumbing Above Ceiling Passed
02/16/2024 COT - HCBU - Framing Passed
02/16/2024 COT - HCPL - Plumbing Intermediate Passed
02/29/2024 COT - HCEL - Electrical Intermediate Passed In wall electrical at both bathrooms, mechanical room, water fountain and conference room approved. 2/29/2024
03/05/2024 COT - HCME - Mechanical Above Ceiling Passed
03/21/2024 COT - FCON - Sprinkler - Final Passed
03/22/2024 COT - HCEL - Electrical Final Passed
03/26/2024 TRSP - ROW - Final/Close-Out Passed
03/25/2024 COT - FCON - Fire - Final Passed
03/27/2024 COT - HCEL - Electrical Above Ceiling Passed
03/27/2024 COT - HCPL - Plumbing Final Passed
03/28/2024 BULD - Electrical Clearance Passed n.a
03/28/2024 COT - BULD - SWG Clearance Passed n/a
03/28/2024 COT - HCBU - Building Above Ceiling Passed
03/28/2024 COT - HCBU - Building Final Passed
03/28/2024 COT - HCME - Mechanical Final Passed
03/28/2024 COT - HCME - Mechanical Intermediate Passed
04/01/2024 ENGR Engineering Final Passed appears complete, no activity, doors locked.

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
FINAL REPORT 2403-155 PHILLIP'S PLUMBING.CLORINATION REPORT-2024-04-01_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-3_PLAN SET_V1.PDF DOCUMENTS VIEW
CONS-2_PLAN SET_V2.PDF DOCUMENTS VIEW