Permit: TC-COM-1023-02501
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
8189 S CAMINO DE CAFE
Address NEW:
8189 S CAMINO DE CAFE
Apply Date:
10/23/2023
Applicant:
Chris Guinter
Description:
A-FAMILY - RITA, LOT 11
Permit Reviews
Permit Number - TC-COM-1023-02501
Permit Status: Complete
Permit Description: A-FAMILY - RITA, LOT 11
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/13/2024 | RESTAMP - COMMERCIAL v.1 | 02/16/2024 | APPROVED |
| 05/06/2026 | SPECIAL INSPECTION REVIEW v.1 | 05/11/2026 | APPROVED |
| 05/12/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/20/2026 | APPROVED |
| 10/30/2023 | COMMERCIAL REVIEW - FULL v.1 | 11/22/2023 | REQUIRES RESUBMIT |
| 02/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/03/2025 | APPROVED |
| 01/30/2025 | COMMERCIAL REVIEW - FULL v.1 | 02/21/2025 | APPROVED |
| 02/06/2024 | COMMERCIAL REVIEW - FULL v.2 | 02/13/2024 | APPROVED |
| 01/13/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/16/2026 | APPROVED |
Conditions
Permit Number - TC-COM-1023-02501
Permit Status: Complete
Permit Description: A-FAMILY - RITA, LOT 11
| Date | Description | Comments |
|---|---|---|
| 02/13/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 02/13/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/30/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/13/2024 | Metal Building Structure with Calculations Designs must be submitted and approved prior to final. | |
| 02/13/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 10/30/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 02/13/2024 | Stair Designs must be submitted and approved prior to... | |
| 02/13/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02501
Permite Description: A-FAMILY - RITA, LOT 11
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/04/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 3-4-25, footing depth not per plans. |
| 03/04/2025 | COT - HCBU - Preslab | N/A | Re-inspection required | 3-4-25- footing depth not per plan. |
| 05/01/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | 5-1-26: not applicable. |
| 05/01/2026 | COT - HCME - Mechanical Final | N/A | Not Applicable | 5-1-26: not applicable. |
| 03/04/2025 | COT - HCEL - Grounding/Bonding | N/A | Re-inspection required | 3-4-25, footing depth not per plan. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02501
Permit Description: A-FAMILY - RITA, LOT 11
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2025 | COT - HCPL - Rough Soil | Passed | 2-25-25, underground plumbing verified as per approved plans. Okay to backfill with shading materials and proceed with construction. | |
| 03/06/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | 3-6-25, excavation/rebar approved. | |
| 03/06/2025 | COT - HCBU - Preslab | Passed | 3-6-25, preslab approved. Okay to pour | |
| 05/30/2025 | COT - HCPL - Sewer | Passed | 5-30-25: verified sewer connection under test and per plans. Okay to backfill approximately 90' of 4" SDR35 plumbing pipe-shading required. | |
| 06/09/2025 | COT - HCPL - Plumbing Intermediate | Passed | 6-9-25: plumbing intermediate and main water line verified under test and per plans. Okay to backfill and continue with construction at progress areas. | |
| 06/09/2025 | COT - HCPL - Yard Water Line | Passed | 6-9-25: plumbing intermediate and main water line verified under test and per plans. Okay to backfill and continue with construction at progress areas. | |
| 06/16/2025 | COT - HCME - Mechanical Intermediate | Passed | 6-16-25: mechanical intermediate approved. | |
| 06/25/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 06/25/2025 | COT - HCBU - Framing | Passed | ||
| 06/25/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 10/28/2025 | COT - HCEL - Electrical Underground | Passed | Passed 10/28/25 ok to backfill | |
| 03/23/2026 | BULD - Electrical Clearance | Passed | 3.23.26 Approved for ECO clearance |
|
| 04/28/2026 | COT - FCON - Fire - Final | Passed | ||
| 04/29/2026 | ENGR Engineering Final | Passed | ||
| 05/01/2026 | TRSP - ROW - Final/Close-Out | Passed | driveway apron and sidewalk completed, site clean and clear of traffic control devices, approved | |
| 05/01/2026 | COT - HCEL - Electrical Intermediate | Passed | 5-1-26: approved. | |
| 05/01/2026 | COT - HCBU - Building Progress | Passed | 5-1-26: approved. | |
| 05/01/2026 | COT - HCEL - Electrical Final | Passed | 5-1-26: electrical final approved. | |
| 05/01/2026 | COT - HCEL - Grounding/Bonding | Passed | 5-1-26: grounding/bonding approved. | |
| 05/01/2026 | COT - HCBU - Building Final | Passed | 5-1-26: building final approved. | |
| 05/01/2026 | COT - HCEL - Outdoor Lighting | Passed | 5-1-26: outdoor lighting approved. | |
| 05/01/2026 | COT - HCPL - Plumbing Final | Passed | 5-1-26: plumbing final. | |
| 05/18/2026 | COT - HCBU - CofO | Passed | All conditions are met and under review. 5/18/2026 |