Permit: TC-COM-1023-02500
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
8197 S CAMINO DE CAFE
Address NEW:
8197 S CAMINO DE CAFE
Apply Date:
10/23/2023
Applicant:
Chris Guinter
Description:
A-FAMILY - RITA, LOT 10
Permit Reviews
Permit Number - TC-COM-1023-02500
Permit Status: Complete
Permit Description: A-FAMILY - RITA, LOT 10
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/13/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/16/2026 | APPROVED |
| 02/13/2024 | RESTAMP - COMMERCIAL v.1 | 02/16/2024 | APPROVED |
| 05/12/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/20/2026 | APPROVED |
| 01/30/2025 | COMMERCIAL REVIEW - FULL v.1 | 02/25/2025 | APPROVED |
| 10/30/2023 | COMMERCIAL REVIEW - FULL v.1 | 11/22/2023 | REQUIRES RESUBMIT |
| 02/06/2024 | COMMERCIAL REVIEW - FULL v.2 | 02/13/2024 | APPROVED |
| 05/06/2026 | SPECIAL INSPECTION REVIEW v.1 | 05/11/2026 | APPROVED |
Conditions
Permit Number - TC-COM-1023-02500
Permit Status: Complete
Permit Description: A-FAMILY - RITA, LOT 10
| Date | Description | Comments |
|---|---|---|
| 02/13/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 02/13/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/30/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/13/2024 | Metal Building Structure with Calculations Designs must be submitted and approved prior to final. | |
| 02/13/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 10/30/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 02/13/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02500
Permite Description: A-FAMILY - RITA, LOT 10
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2025 | COT - HCPL - Rough Soil | N/A | Partial Pass | 2/26/25: plumbing underground per plans. Ok to backfill underground plumbing at slab. Shading required. Pending tracer wire at 3" sewer line outside of building footprint. |
| 04/30/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | 4-30-26: not applicable. |
| 03/14/2025 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | 3-14-25, partial pass for ufer only. |
| 04/30/2026 | COT - HCME - Mechanical Final | N/A | Not Applicable | 4-30-26: not applicable. |
| 06/13/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 6.13.25 Electrical progress verified as per plan in storage and bathroom. Approved to continue construction. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02500
Permit Description: A-FAMILY - RITA, LOT 10
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2025 | COT - HCPL - Rough Soil | Passed | ||
| 03/14/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | 3-14-25, excavation, reinforcement, and setbacks per plans. Okay to pour concrete | |
| 03/14/2025 | COT - HCBU - Preslab | Passed | 3-14-25, preslab,excavation, reinforcement, and setbacks per plans. Okay to pour concrete | |
| 05/30/2025 | COT - HCPL - Sewer | Passed | 5-30-25: verified sewer connection under test and per plans. Okay to backfill approximately 90' of 4" SDR35 plumbing pipe-shading required. | |
| 06/06/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 06/06/2025 | COT - HCPL - Yard Water Line | Passed | ||
| 06/16/2025 | COT - HCME - Mechanical Intermediate | Passed | 6-16-25: mechanical intermediate approved. | |
| 06/25/2025 | COT - HCBU - Framing | Passed | ||
| 06/25/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 06/25/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 10/28/2025 | COT - HCEL - Electrical Underground | Passed | Passed 10/28/25 ok to backfill | |
| 03/23/2026 | BULD - Electrical Clearance | Passed | 3.23.26 Approved for ECO clearance |
|
| 04/28/2026 | COT - FCON - Fire - Final | Passed | ||
| 04/29/2026 | ENGR Engineering Final | Passed | ||
| 04/30/2026 | COT - HCPL - Plumbing Final | Passed | 4-30-26: plumbing final approved. | |
| 04/30/2026 | COT - HCBU - Building Progress | Passed | 4-30-26: approved. | |
| 04/30/2026 | COT - HCEL - Grounding/Bonding | Passed | 4-30-26: approved. | |
| 04/30/2026 | COT - HCEL - Outdoor Lighting | Passed | 4-30-26: approved. | |
| 04/30/2026 | COT - HCEL - Electrical Intermediate | Passed | 4-30-26: approved. | |
| 05/06/2026 | TRSP - ROW - Final/Close-Out | Passed | Apron cracks fixed, site, clear of debris and traffic control devices, approved | |
| 05/18/2026 | COT - HCEL - Electrical Final | Passed | ||
| 05/19/2026 | COT - HCBU - Building Final | Passed | ||
| 05/19/2026 | COT - HCBU - CofO | Passed |