Permit: TC-COM-1023-02412
Permit Details
Apply Date:
10/16/2023
Applicant:
Description:
Replace existing evaporative cooler serving the kitchen with an air conditioner
Permit Reviews
Permit Number - TC-COM-1023-02412
Permit Status: Issued
Permit Description: Replace existing evaporative cooler serving the kitchen with an air conditioner
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/21/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 11/28/2023 | APPROVED |
| 11/28/2023 | RESTAMP - COMMERCIAL v.1 | 11/29/2023 | REQUIRES RESUBMIT |
| 12/01/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 12/13/2023 | APPROVED |
| 10/16/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 10/23/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-1023-02412
Permit Status: Issued
Permit Description: Replace existing evaporative cooler serving the kitchen with an air conditioner
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/28/2023 | AIR BALANCING REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-1023-02412
Permit Status: Issued
Permit Description: Replace existing evaporative cooler serving the kitchen with an air conditioner
| Date | Description | Comments |
|---|---|---|
| 10/16/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-1023-02412
Permit Description: Replace existing evaporative cooler serving the kitchen with an air conditioner
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2024 | COT - LCEL - Electrical Above Ceiling | Passed | Registers are properly installed and wired to the structure. Electrical conduit from panel to new unit is properly installed and secured. | |
| 05/01/2024 | COT - LCME - Mechanical Final | Passed | New A/C unit is installed on roof for kitchen area and is fully operational. | |
| 05/01/2024 | COT - LCPL - Plumbing Final | Passed | Complete | |
| 05/01/2024 | COT - LCEL - Electrical Final | Passed | Electrical is complete, panel is properly labeled. | |
| 05/01/2024 | COT - LCME - Mechanical Intermediate | Passed | ||
| 05/01/2024 | COT - LCEL - Electrical Intermediate | Passed |