Permit: TC-COM-1023-02341
Permit Details
Apply Date:
10/04/2023
Applicant:
Description:
New solar PV system to supplement resident usage throughout the community. The system will consist of 1471 solar panel mounted on elevated solar racking over the existing parking spaces ("solar carports") and on rooftops in common areas. 1471 modules REV2: 1. We are replacing the existing 100A fuses from the existing main switch gear with new 150A fuses. SEE SHEETS E-601, & E-602. 2. We are replacing the original proposed 110A fuses from the new main solar LI switch (load interrupter 10) with new 150A fuses, and before we have called 3 sets of parallel conductors from the mentioned LI switch up to the POI, but it is actually only 1 set, we fixed that on the SLD. SEE SHEETS E-601, & E-602.
Permit Reviews
Permit Number - TC-COM-1023-02341
Permit Status: Complete
Permit Description: New solar PV system to supplement resident usage throughout the community. The system will consist of 1471 solar panel mounted on elevated solar racking over the existing parking spaces ("solar carports") and on rooftops in common areas.
1471 modules
REV2:
1. We are replacing the existing 100A fuses from the existing main switch gear with new 150A fuses. SEE SHEETS E-601, & E-602.
2. We are replacing the original proposed 110A fuses from the new main solar LI switch (load interrupter 10) with new 150A fuses, and before we have called 3 sets of parallel conductors from the mentioned LI switch up to the POI, but it is actually only 1 set, we fixed that on the SLD. SEE SHEETS E-601, & E-602.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/05/2024 | RESTAMP - COMMERCIAL v.1 | 03/14/2024 | APPROVED |
| 01/29/2024 | COMMERCIAL REVIEW - FULL v.2 | 03/05/2024 | APPROVED |
| 05/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/15/2025 | REQUIRES RESUBMIT |
| 05/19/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 05/20/2025 | APPROVED |
| 10/05/2023 | COMMERCIAL REVIEW - FULL v.1 | 11/08/2023 | REQUIRES RESUBMIT |
| 11/05/2024 | RESTAMP - COMMERCIAL v.1 | 11/07/2024 | APPROVED |
| 10/15/2024 | COMMERCIAL REVIEW - FULL v.2 | 11/05/2024 | APPROVED |
| 08/27/2024 | COMMERCIAL REVIEW - FULL v.1 | 09/27/2024 | REQUIRES RESUBMIT |
| 04/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/29/2025 | REQUIRES RESUBMIT |
| 02/27/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 03/11/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1023-02341
Permit Status: Complete
Permit Description: New solar PV system to supplement resident usage throughout the community. The system will consist of 1471 solar panel mounted on elevated solar racking over the existing parking spaces ("solar carports") and on rooftops in common areas.
1471 modules
REV2:
1. We are replacing the existing 100A fuses from the existing main switch gear with new 150A fuses. SEE SHEETS E-601, & E-602.
2. We are replacing the original proposed 110A fuses from the new main solar LI switch (load interrupter 10) with new 150A fuses, and before we have called 3 sets of parallel conductors from the mentioned LI switch up to the POI, but it is actually only 1 set, we fixed that on the SLD. SEE SHEETS E-601, & E-602.
| Date | Description | Comments |
|---|---|---|
| 05/20/2025 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 11/08/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/08/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 11/08/2023 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
| 11/08/2023 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. | |
| 11/08/2023 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02341
Permite Description: New solar PV system to supplement resident usage throughout the community. The system will consist of 1471 solar panel mounted on elevated solar racking over the existing parking spaces ("solar carports") and on rooftops in common areas.
1471 modules
REV2:
1. We are replacing the existing 100A fuses from the existing main switch gear with new 150A fuses. SEE SHEETS E-601, & E-602.
2. We are replacing the original proposed 110A fuses from the new main solar LI switch (load interrupter 10) with new 150A fuses, and before we have called 3 sets of parallel conductors from the mentioned LI switch up to the POI, but it is actually only 1 set, we fixed that on the SLD. SEE SHEETS E-601, & E-602.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2025 | COT - CSOL - Electrical Underground Solar Project | N/A | Partial Pass | Partial approval for conduit risers to solar equipment and electrical panels for Systems #1, #2,#3 - okay to backfill progress areas, and okay for concrete placement for equipment pads |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02341
Permit Description: New solar PV system to supplement resident usage throughout the community. The system will consist of 1471 solar panel mounted on elevated solar racking over the existing parking spaces ("solar carports") and on rooftops in common areas.
1471 modules
REV2:
1. We are replacing the existing 100A fuses from the existing main switch gear with new 150A fuses. SEE SHEETS E-601, & E-602.
2. We are replacing the original proposed 110A fuses from the new main solar LI switch (load interrupter 10) with new 150A fuses, and before we have called 3 sets of parallel conductors from the mentioned LI switch up to the POI, but it is actually only 1 set, we fixed that on the SLD. SEE SHEETS E-601, & E-602.
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2025 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
| 01/13/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | Approved foundation at each solar canopy column, okay for concrete placement | |
| 03/05/2025 | COT - CSOL - Electrical Underground Solar Project | Passed | Approved pull boxes, all underground is complete | |
| 04/03/2025 | COT - CSOL - Electrical Final Solar Project | Passed | ||
| 04/03/2025 | BULD - Electrical Clearance | Passed | Approved solar structures #1, #2, #3 - DGC Clearance to TEP is required for the solar meter | |
| 04/03/2025 | ENGR Engineering Final | Passed | ||
| 04/14/2025 | COT - LCBU - Building Final | Passed | ||
| 04/14/2025 | COT - LCEL - Electrical Final | Passed | ||
| 04/10/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 04/14/2025 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
| 04/10/2025 | COT - LCBU - Framing | Passed | ||
| 04/14/2025 | COT - CSOL - Electrical Progress Solar Project | Passed |