Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
10/04/2023
Applicant:
Katharine Kent
Description:
Installing 55.5 kW DC/ 42.18KW AC 3 Phase Solar System 111 modules

Permit Reviews

Permit Number - TC-COM-1023-02338
Permit Status: Complete
Permit Description: Installing 55.5 kW DC/ 42.18KW AC 3 Phase Solar System 111 modules
Start Date Submittal Complete Date Status  
10/04/2023 COMMERCIAL REVIEW - FULL v.1 11/05/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-1023-02338
Permit Status: Complete
Permit Description: Installing 55.5 kW DC/ 42.18KW AC 3 Phase Solar System 111 modules
Date Description Comments
11/03/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1023-02338
Permit Description: Installing 55.5 kW DC/ 42.18KW AC 3 Phase Solar System 111 modules
Total Completed Inspections - 8
Date Description Inspector Results Comments
11/29/2023 COT - CSOL - Electrical Final Solar Project Passed
11/29/2023 COT - CSOL - Electrical Progress Solar Project Passed
11/29/2023 COT - LCBU - Building Final Passed
11/29/2023 ENGR Engineering Final Passed
11/30/2023 TRSP - ROW - Final/Close-Out Passed
11/29/2023 COT - CSOL - Electrical Intermediate Solar Project Passed
11/29/2023 COT - CSOL - Grounding/Bonding Solar Project Passed
11/29/2023 BULD - Electrical Clearance Passed Approved solar installation, DGC Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-GLHN - PERDWG_V1.PDF DOCUMENTS VIEW