Permit: TC-COM-1023-02327
Permit Details
Apply Date:
10/03/2023
Applicant:
Jason Reimer
Description:
tenant finish out of an existing lease space
Permit Reviews
Permit Number - TC-COM-1023-02327
Permit Status: Complete
Permit Description: tenant finish out of an existing lease space
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/03/2023 | COMMERCIAL REVIEW - FULL v.1 | 10/27/2023 | APPROVED |
03/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/15/2024 | APPROVED |
Conditions
Permit Number - TC-COM-1023-02327
Permit Status: Complete
Permit Description: tenant finish out of an existing lease space
Date | Description | Comments |
---|---|---|
03/13/2024 | AIR BALANCING REPORT IS REQUIRED. | |
10/03/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
03/13/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02327
Permite Description: tenant finish out of an existing lease space
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/12/2024 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | Main supply ductwork is installed, exhaust ductwork is being installed, grid ceiling is not installed yet so diffusers and registers cannot be installed. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02327
Permit Description: tenant finish out of an existing lease space
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/15/2023 | COT - HCBU - Preslab | Passed | ||
12/06/2023 | COT - HCBU - Framing | Passed | ||
12/06/2023 | COT - HCEL - Electrical Intermediate | Passed | ||
12/20/2023 | COT - HCPL - Plumbing Intermediate | Passed | 12/20/23: Plumbing rough-in is complete in all interior walls. Okay to proceed with drywall, insulation, taping, and texturing walls. | |
12/20/2023 | COT - HCEL - Electrical Above Ceiling | Passed | Electrical rough-in above ceiling is complete and meets building plans and specifications. | |
02/06/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
02/06/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
02/21/2024 | BULD - Electrical Clearance | Passed | Two meters; 107M1, and 107M2. | |
02/21/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
02/21/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
02/21/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
02/21/2024 | COT - HCPL - Gas Final | Passed | ||
03/07/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
03/07/2024 | ENGR Engineering Final | Passed | solid waste dumpster to be removed by 3/8/24. | |
03/07/2024 | COT - HCEL - Electrical Final | Passed | ||
03/13/2024 | COT - FCON - Fire - Final | Passed | ||
03/15/2024 | COT - HCBU - Building Final | Passed | ||
03/15/2024 | COT - HCME - Mechanical Final | Passed | ||
03/15/2024 | COT - HCPL - Plumbing Final | Passed | ||
03/19/2024 | COT - FCON - Sprinkler - Final | Passed |