Permit Details

Status:
Complete
Type:
Commercial Building
Address:
107 N PANTANO RD
Apply Date:
10/03/2023
Applicant:
Jason Reimer
Description:
tenant finish out of an existing lease space

Permit Reviews

Permit Number - TC-COM-1023-02327
Permit Status: Complete
Permit Description: tenant finish out of an existing lease space
Start Date Submittal Complete Date Status  
10/03/2023 COMMERCIAL REVIEW - FULL v.1 10/27/2023 APPROVED Review Details
03/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/15/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-1023-02327
Permit Status: Complete
Permit Description: tenant finish out of an existing lease space
Date Description Comments
03/13/2024 AIR BALANCING REPORT IS REQUIRED.
10/03/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/13/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1023-02327
Permite Description: tenant finish out of an existing lease space
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/12/2024 COT - HCME - Mechanical Intermediate N/A Partial Pass Main supply ductwork is installed, exhaust ductwork is being installed, grid ceiling is not installed yet so diffusers and registers cannot be installed.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1023-02327
Permit Description: tenant finish out of an existing lease space
Total Completed Inspections - 20
Date Description Inspector Results Comments
11/15/2023 COT - HCBU - Preslab Passed
12/06/2023 COT - HCBU - Framing Passed
12/06/2023 COT - HCEL - Electrical Intermediate Passed
12/20/2023 COT - HCPL - Plumbing Intermediate Passed 12/20/23: Plumbing rough-in is complete in all interior walls. Okay to proceed with drywall, insulation, taping, and texturing walls.
12/20/2023 COT - HCEL - Electrical Above Ceiling Passed Electrical rough-in above ceiling is complete and meets building plans and specifications.
02/06/2024 COT - BULD - SWG Clearance Passed SWG for meter only
02/06/2024 COT - HCBU - Building Above Ceiling Passed
02/21/2024 BULD - Electrical Clearance Passed Two meters; 107M1, and 107M2.
02/21/2024 COT - HCME - Mechanical Above Ceiling Passed
02/21/2024 COT - HCME - Mechanical Intermediate Passed
02/21/2024 COT - HCPL - Plumbing Above Ceiling Passed
02/21/2024 COT - HCPL - Gas Final Passed
03/07/2024 TRSP - ROW - Final/Close-Out Passed
03/07/2024 ENGR Engineering Final Passed solid waste dumpster to be removed by 3/8/24.
03/07/2024 COT - HCEL - Electrical Final Passed
03/13/2024 COT - FCON - Fire - Final Passed
03/15/2024 COT - HCBU - Building Final Passed
03/15/2024 COT - HCME - Mechanical Final Passed
03/15/2024 COT - HCPL - Plumbing Final Passed
03/19/2024 COT - FCON - Sprinkler - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-_2023.09.14 - URV23009 - URGENT VET_TUCSON, AZ- ISSUE FOR PERMIT_V1.PDF DOCUMENTS VIEW
URGENT VET - TUCSON AZ COMPLIANCE CERTIFICATES 9.14.23_V1.PDF DOCUMENTS VIEW