Permit: TC-COM-0926-01599
Permit Details
Status:
Needs Resubmittal
Type:
Commercial Building
Address:
1039 N STONE AV
Address NEW:
1039 N STONE AV
Apply Date:
09/24/2026
Applicant:
Charles Pifer
Description:
(RESTRICTED RECORD) 5-story low income / mixed income apartment building. LIHTC. El Pueblo / HCD project.
Permit Reviews
Permit Number - TC-COM-0926-01599
Permit Status: Needs resubmittal
Permit Description: (RESTRICTED RECORD) 5-story low income / mixed income apartment building. LIHTC. El Pueblo / HCD project.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/30/2026 | HAST - COMMERCIAL NEW ADD/ALT FAST TRACK v.1 | 10/26/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0926-01599
Permit Status: Needs resubmittal
Permit Description: (RESTRICTED RECORD) 5-story low income / mixed income apartment building. LIHTC. El Pueblo / HCD project.
Total Outstanding Activity Conditions - 16
| Date | Name |
|---|---|
| 09/30/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 10/15/2026 | Prior to Final - Required Documents - AIR BALANCING REPORT IS REQUIRED. |
| 10/15/2026 | Prior to Final - Required Documents - Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 10/15/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
| 10/22/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 10/22/2026 | Prior to Final - Required Documents - COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
| 10/22/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
| 10/22/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 10/22/2026 | PARKING COVERS plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 10/22/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 10/22/2026 | Prior to Final - Required Documents - Post-Installed Anchor Inspection Report is required. |
| 10/22/2026 | SOLAR Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 10/22/2026 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 10/22/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
| 10/22/2026 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
| 10/22/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |