Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Commercial Building
Address:
1039 N STONE AV
Address NEW:
1039 N STONE AV
Apply Date:
09/24/2026
Applicant:
Charles Pifer
Description:
(RESTRICTED RECORD) 5-story low income / mixed income apartment building. LIHTC. El Pueblo / HCD project.

Permit Reviews

Permit Number - TC-COM-0926-01599
Permit Status: Needs resubmittal
Permit Description: (RESTRICTED RECORD) 5-story low income / mixed income apartment building. LIHTC. El Pueblo / HCD project.
Start Date Submittal Complete Date Status  
09/30/2026 HAST - COMMERCIAL NEW ADD/ALT FAST TRACK v.1 10/26/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0926-01599
Permit Status: Needs resubmittal
Permit Description: (RESTRICTED RECORD) 5-story low income / mixed income apartment building. LIHTC. El Pueblo / HCD project.
Total Outstanding Activity Conditions - 16
Date Name
09/30/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/15/2026 Prior to Final - Required Documents - AIR BALANCING REPORT IS REQUIRED.
10/15/2026 Prior to Final - Required Documents - Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
10/15/2026 WATER STERILIZATION REPORT IS REQUIRED.
10/22/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/22/2026 Prior to Final - Required Documents - COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
10/22/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
10/22/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
10/22/2026 PARKING COVERS plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
10/22/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/22/2026 Prior to Final - Required Documents - Post-Installed Anchor Inspection Report is required.
10/22/2026 SOLAR Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
10/22/2026 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/22/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
10/22/2026 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
10/22/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.