Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
09/30/2025
Applicant:
Allison Reis
Description:
Minor remodel for new exterior shell for Suite 150. Tenant interior per separate permit.

Permit Reviews

Permit Number - TC-COM-0925-01782
Permit Status: Inspections
Permit Description: Minor remodel for new exterior shell for Suite 150. Tenant interior per separate permit.
Start Date Submittal Complete Date Status  
01/16/2026 ADMINISTRATIVE v.1 01/16/2026 REQUIRES RESUBMIT Review Details
09/30/2025 COMMERCIAL REVIEW - FULL v.1 10/29/2025 REQUIRES RESUBMIT Review Details
12/05/2025 COMMERCIAL REVIEW - FULL v.2 12/30/2025 REQUIRES RESUBMIT Review Details
01/02/2026 COMMERCIAL REVIEW - FULL v.3 01/16/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0925-01782
Permit Status: Inspections
Permit Description: Minor remodel for new exterior shell for Suite 150. Tenant interior per separate permit.
Total Outstanding Activity Conditions - 2
Date Name
10/21/2025 SPECIAL INSPECTION OF EXPANSION, EPOXY, ADHESIVE, AND SCREW ANCHORS IS REQUIRED.
10/21/2025 SPECIAL INSPECTION OF STEEL CONSTRUCTION IS REQUIRED.

Conditions

Permit Number - TC-COM-0925-01782
Permit Status: Inspections
Permit Description: Minor remodel for new exterior shell for Suite 150. Tenant interior per separate permit.
Date Description Comments
12/23/2025 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor.
09/30/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/21/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0925-01782
Permite Description: Minor remodel for new exterior shell for Suite 150. Tenant interior per separate permit.
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
08/21/2026 COT - LCBU - Excavation/Rebar/Zoning N/A Not Applicable
08/21/2026 COT - LCPL - Plumbing Above Ceiling N/A Not Applicable
08/21/2026 COT - LCBU - Preslab N/A Not Applicable
08/21/2026 COT - LCBU - Roof Nailing N/A Not Applicable
08/21/2026 COT - LCBU - Stem Wall/Retaining Wall N/A Not Applicable
08/28/2026 COT - LCEL - Electrical Above Ceiling N/A Not Applicable
COT - FCON - Alarm - Final N/A Scheduled
08/31/2026 COT - BULD - SWG Clearance N/A Not Ready
08/31/2026 COT - LCPL - Gas Pressure Test N/A Not Ready

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0925-01782
Permit Description: Minor remodel for new exterior shell for Suite 150. Tenant interior per separate permit.
Total Completed Inspections - 11
Date Description Inspector Results Comments
03/20/2026 COT - LCBU - Framing Passed Phase Two Shell.
08/03/2026 COT - LCPL - Sewer Passed 8.3.26
Complete tie-in on north end.
08/03/2026 COT - LCPL - Rough Soil Passed
08/21/2026 COT - LCBU - Masonry Pregrout Passed
08/28/2026 COT - LCME - Mechanical Intermediate Passed
08/28/2026 COT - LCEL - Electrical Intermediate Passed
08/28/2026 COT - LCPL - Plumbing Roof Drains Passed
08/28/2026 COT - LCPL - Plumbing Intermediate Passed
08/31/2026 COT - FCON - Fire - Final Passed
08/31/2026 COT - LCPL - Plumbing Final Passed
08/31/2026 COT - LCPL - Gas Pressure Test Passed

Scheduled Inspections

Scheduled Inspections - TC-COM-0925-01782
Status: Inspections
Description: Minor remodel for new exterior shell for Suite 150. Tenant interior per separate permit.
Scheduled Date Description Entered By Entered Date
08/31/2026 COT - FCON - Alarm - Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .