Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
09/28/2025
Applicant:
Brandy Burke
Description:
TENANT IMPROVEMENT PROJECT: ALTERATION TO AN EXISTING TENANT SPACE WORK TO INCLUDE NEW INTERIOR WALL(S), CEILING SYSTEMS, MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS, INTERIOR FINISHES, MILLWORK AND RESTROOM. EXITING REQUIREMENTS ARE TO BE MAINTAINED. THIS ALTERATION DOES NOT MODIFY THE SQUARE FOOTAGE OF THE SPACE

Permit Reviews

Permit Number - TC-COM-0925-01773
Permit Status: Issued
Permit Description: TENANT IMPROVEMENT PROJECT: ALTERATION TO AN EXISTING TENANT SPACE WORK TO INCLUDE NEW INTERIOR WALL(S), CEILING SYSTEMS, MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS, INTERIOR FINISHES, MILLWORK AND RESTROOM. EXITING REQUIREMENTS ARE TO BE MAINTAINED. THIS ALTERATION DOES NOT MODIFY THE SQUARE FOOTAGE OF THE SPACE
Start Date Submittal Complete Date Status  
12/01/2025 ADMINISTRATIVE v.1 12/01/2025 REQUIRES RESUBMIT Review Details
11/10/2025 COMMERCIAL REVIEW - LIMITED v.2 11/20/2025 REQUIRES RESUBMIT Review Details
12/03/2025 ADMINISTRATIVE v.2 12/03/2025 APPROVED Review Details
09/29/2025 COMMERCIAL REVIEW - LIMITED v.1 10/16/2025 REQUIRES RESUBMIT Review Details
11/20/2025 COMMERCIAL REVIEW - LIMITED v.3 11/25/2025 APPROVED Review Details
11/25/2025 RESTAMP - COMMERCIAL v.1 12/01/2025 APPROVED Review Details
01/28/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/03/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0925-01773
Permit Status: Issued
Permit Description: TENANT IMPROVEMENT PROJECT: ALTERATION TO AN EXISTING TENANT SPACE WORK TO INCLUDE NEW INTERIOR WALL(S), CEILING SYSTEMS, MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS, INTERIOR FINISHES, MILLWORK AND RESTROOM. EXITING REQUIREMENTS ARE TO BE MAINTAINED. THIS ALTERATION DOES NOT MODIFY THE SQUARE FOOTAGE OF THE SPACE
Total Outstanding Activity Conditions - 1
Date Name
11/21/2025 AIR BALANCING REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0925-01773
Permit Status: Issued
Permit Description: TENANT IMPROVEMENT PROJECT: ALTERATION TO AN EXISTING TENANT SPACE WORK TO INCLUDE NEW INTERIOR WALL(S), CEILING SYSTEMS, MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS, INTERIOR FINISHES, MILLWORK AND RESTROOM. EXITING REQUIREMENTS ARE TO BE MAINTAINED. THIS ALTERATION DOES NOT MODIFY THE SQUARE FOOTAGE OF THE SPACE
Date Description Comments
09/29/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
09/29/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/21/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0925-01773
Permite Description: TENANT IMPROVEMENT PROJECT: ALTERATION TO AN EXISTING TENANT SPACE WORK TO INCLUDE NEW INTERIOR WALL(S), CEILING SYSTEMS, MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS, INTERIOR FINISHES, MILLWORK AND RESTROOM. EXITING REQUIREMENTS ARE TO BE MAINTAINED. THIS ALTERATION DOES NOT MODIFY THE SQUARE FOOTAGE OF THE SPACE
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/16/2025 BULD - Electrical Clearance N/A Not Ready called for other inspection
02/02/2026 COT - LCBU - Building Final N/A Partial Pass

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0925-01773
Permit Description: TENANT IMPROVEMENT PROJECT: ALTERATION TO AN EXISTING TENANT SPACE WORK TO INCLUDE NEW INTERIOR WALL(S), CEILING SYSTEMS, MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS, INTERIOR FINISHES, MILLWORK AND RESTROOM. EXITING REQUIREMENTS ARE TO BE MAINTAINED. THIS ALTERATION DOES NOT MODIFY THE SQUARE FOOTAGE OF THE SPACE
Total Completed Inspections - 11
Date Description Inspector Results Comments
12/17/2025 COT - HCPL - Rough Soil Passed
12/22/2025 COT - LCBU - Framing Passed
12/22/2025 COT - LCEL - Electrical Intermediate Passed
12/22/2025 COT - LCPL - Plumbing Intermediate Passed
01/21/2026 COT - LCEL - Electrical Above Ceiling Passed
01/21/2026 COT - LCME - Mechanical Intermediate Passed
02/02/2026 COT - LCEL - Electrical Final Passed
02/02/2026 COT - FCON - Fire - Final Passed
02/02/2026 COT - FCON - Sprinkler - Final Passed
02/02/2026 COT - LCME - Mechanical Final Passed
02/02/2026 COT - LCPL - Plumbing Final Passed

Scheduled Inspections

Scheduled Inspections - TC-COM-0925-01773
Status: Issued
Description: TENANT IMPROVEMENT PROJECT: ALTERATION TO AN EXISTING TENANT SPACE WORK TO INCLUDE NEW INTERIOR WALL(S), CEILING SYSTEMS, MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS, INTERIOR FINISHES, MILLWORK AND RESTROOM. EXITING REQUIREMENTS ARE TO BE MAINTAINED. THIS ALTERATION DOES NOT MODIFY THE SQUARE FOOTAGE OF THE SPACE
Scheduled Date Description Entered By Entered Date
02/04/2026 COT - LCBU - Building Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-CONSTRUCTIONPLANS_1865ERIVERRD_SUITE151_251106_V2.PDF DOCUMENTS VIEW