Permit: TC-COM-0925-01765
Permit Details
Apply Date:
09/26/2025
Applicant:
Alexander Silvers
Description:
Shell building improvement: no square footage added; no change in site conditions.
Permit Reviews
Permit Number - TC-COM-0925-01765
Permit Status: Inspections
Permit Description: Shell building improvement: no square footage added; no change in site conditions.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/11/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 12/26/2025 | APPROVED |
| 12/26/2025 | ADMINISTRATIVE v.1 | 12/26/2025 | REQUIRES RESUBMIT |
| 01/07/2026 | ADMINISTRATIVE v.2 | 01/07/2026 | APPROVED |
| 09/26/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 10/21/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0925-01765
Permit Status: Inspections
Permit Description: Shell building improvement: no square footage added; no change in site conditions.
| Date | Description | Comments |
|---|---|---|
| 09/26/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 09/26/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0925-01765
Permite Description: Shell building improvement: no square footage added; no change in site conditions.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2026 | COT - LCBU - Framing | N/A | Re-inspection required | 4/20/26 Missing fasteners on hangar for Glulam on north and south end of building. |
| 05/04/2026 | COT - LCBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0925-01765
Permit Description: Shell building improvement: no square footage added; no change in site conditions.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/2026 | COT - LCBU - Framing | Passed | 4/27/26 corrections made |