Permit Details

Status:
Needs Resubmittal
Type:
Commercial Building
Address:
855 W PRINCE RD
Address NEW:
855 W PRINCE RD
Apply Date:
09/24/2025
Applicant:
angel islas
Description:
THIS PROJECT IS A 3-STORY NEW CONSTRUCTION APARTMENT BUILDING. IT HAS 100 STUDIO (438 NSF) DWELLING UNITS FOR THE ELDERLY. SEE DEVELOPMENT PLAN #TD-DEV-0925-00236 FOR ALL SITE RELATED CONSTRUCTION.

Permit Reviews

Permit Number - TC-COM-0925-01751
Permit Status: Needs resubmittal
Permit Description: THIS PROJECT IS A 3-STORY NEW CONSTRUCTION APARTMENT BUILDING. IT HAS 100 STUDIO (438 NSF) DWELLING UNITS FOR THE ELDERLY. SEE DEVELOPMENT PLAN #TD-DEV-0925-00236 FOR ALL SITE RELATED CONSTRUCTION.
Start Date Submittal Complete Date Status  
11/07/2025 COMMERCIAL REVIEW - FULL v.2 12/03/2025 REQUIRES RESUBMIT Review Details
09/25/2025 COMMERCIAL REVIEW - FULL v.1 10/24/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0925-01751
Permit Status: Needs resubmittal
Permit Description: THIS PROJECT IS A 3-STORY NEW CONSTRUCTION APARTMENT BUILDING. IT HAS 100 STUDIO (438 NSF) DWELLING UNITS FOR THE ELDERLY. SEE DEVELOPMENT PLAN #TD-DEV-0925-00236 FOR ALL SITE RELATED CONSTRUCTION.
Total Outstanding Activity Conditions - 22
Date Name
09/25/2025 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
09/25/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/25/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
11/17/2025 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
11/17/2025 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
11/17/2025 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
11/17/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/17/2025 Elevator Designs must be submitted and approved prior to ...
11/17/2025 ELEVATOR INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
11/17/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/17/2025 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
11/17/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
11/17/2025 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
11/17/2025 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
11/17/2025 Masonry Inspection Report submittal review is required.
11/17/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
11/17/2025 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
11/17/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
11/17/2025 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.
11/17/2025 SPECIAL INSPECTION FOR WELDING IS REQUIRED.
11/17/2025 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.
12/05/2025 Prior to project being finalized and CofO issuance, applicant must provide recorded shared access easement and utility easement documentation as noted in their response letter and on DP plans (Sheet C3.0).