Permit: TC-COM-0925-01689
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
3719 E FAIRMOUNT ST UNIT 4
Address NEW:
3719 E FAIRMOUNT ST UNIT 4
Apply Date:
09/17/2025
Applicant:
Parker and Sons Environmental Conditioning LLC
Description:
Emergency meter and disconnect replacement- occupied structure with intermittent power due to damaged electrical equipment - replacing meter socket, 60A fused disconnect and adding grounding/bonding
Permit Reviews
Permit Number - TC-COM-0925-01689
Permit Status: Inspections
Permit Description: Emergency meter and disconnect replacement- occupied structure with intermittent power due to damaged electrical equipment - replacing meter socket, 60A fused disconnect and adding grounding/bonding
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/17/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 09/17/2025 | APPROVED |
| 09/18/2025 | ADMINISTRATIVE v.1 | 09/18/2025 | REQUIRES RESUBMIT |
| 09/18/2025 | ADMINISTRATIVE v.2 | 09/18/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0925-01689
Permit Status: Inspections
Permit Description: Emergency meter and disconnect replacement- occupied structure with intermittent power due to damaged electrical equipment - replacing meter socket, 60A fused disconnect and adding grounding/bonding
| Date | Description | Comments |
|---|---|---|
| 09/17/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0925-01689
Permit Description: Emergency meter and disconnect replacement- occupied structure with intermittent power due to damaged electrical equipment - replacing meter socket, 60A fused disconnect and adding grounding/bonding
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2025 | BULD - Electrical Clearance | Passed | Approved 60A disconnect equipment upgrade and grounding - INCR Clearance was called into TEP at 12 noon for unit #4 | |
| 09/22/2025 | COT - LCEL - Electrical Final | Passed |