Permit: TC-COM-0925-01675
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
6410 E TANQUE VERDE RD
Address NEW:
6410 E TANQUE VERDE RD
Apply Date:
09/15/2025
Applicant:
Annette Suarez
Description:
Remodel of an existing office (REV 1: Redesigned using wood construction, not steel)
Permit Reviews
Permit Number - TC-COM-0925-01675
Permit Status: Complete
Permit Description: Remodel of an existing office (REV 1: Redesigned using wood construction, not steel)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/20/2025 | ADMINISTRATIVE v.2 | 11/20/2025 | REQUIRES RESUBMIT |
| 06/17/2026 | SPECIAL INSPECTION REVIEW v.3 | 06/17/2026 | APPROVED |
| 12/16/2025 | ADMINISTRATIVE v.4 | 12/16/2025 | APPROVED |
| 12/08/2025 | ADMINISTRATIVE v.3 | 12/08/2025 | REQUIRES RESUBMIT |
| 02/18/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/20/2026 | APPROVED |
| 09/15/2025 | COMMERCIAL REVIEW - FULL v.1 | 10/17/2025 | APPROVED |
| 01/21/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/27/2026 | APPROVED |
| 04/09/2026 | SPECIAL INSPECTION REVIEW v.2 | 04/09/2026 | REQUIRES RESUBMIT |
| 12/09/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/17/2025 | APPROVED |
| 05/18/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 06/08/2026 | APPROVED |
| 02/11/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/12/2026 | REQUIRES RESUBMIT |
| 04/03/2026 | SPECIAL INSPECTION REVIEW v.1 | 04/08/2026 | REQUIRES RESUBMIT |
| 04/14/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/15/2026 | APPROVED |
| 10/17/2025 | ADMINISTRATIVE v.1 | 10/17/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0925-01675
Permit Status: Complete
Permit Description: Remodel of an existing office (REV 1: Redesigned using wood construction, not steel)
| Date | Description | Comments |
|---|---|---|
| 10/01/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 09/15/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 10/02/2025 | SPECIAL INSPECTION FOR EPOXY INSTALLATIONS IS REQUIRED. | |
| 10/02/2025 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 09/15/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/02/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 10/01/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0925-01675
Permite Description: Remodel of an existing office (REV 1: Redesigned using wood construction, not steel)
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 02/27/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 02/27/2026 | COT - LCBU - Masonry Pregrout | N/A | Not Applicable | |
| 02/27/2026 | COT - LCPL - Rough Soil | N/A | Not Applicable | |
| 03/09/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | Address identification (range on building, sweet numbers) |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0925-01675
Permit Description: Remodel of an existing office (REV 1: Redesigned using wood construction, not steel)
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2025 | COT - LCBU - Framing | Passed | ||
| 12/19/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 12/19/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 01/15/2026 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 01/15/2026 | COT - LCBU - Preslab | Passed | ||
| 01/30/2026 | COT - LCBU - Roof Nailing | Passed | Passed 1/30/26 | |
| 02/18/2026 | COT - LCEL - Electrical Above Ceiling | Passed | Passed 2/18/26 | |
| 02/27/2026 | COT - LCEL - Electrical Final | Passed | ||
| 02/27/2026 | COT - LCBU - Building Final | Passed | ||
| 02/27/2026 | COT - LCME - Mechanical Final | Passed | ||
| 02/27/2026 | COT - LCPL - Plumbing Final | Passed | ||
| 02/27/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 03/02/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 02/27/2026 | COT - LCBU - Stem Wall/Retaining Wall | Passed | ||
| 02/27/2026 | COT - LCME - Mechanical Intermediate | Passed | ||
| 03/24/2026 | COT - FCON - Fire - Final | Passed |