Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
6410 E TANQUE VERDE RD
Apply Date:
09/15/2025
Applicant:
Annette Suarez
Description:
Remodel of an existing office (REV 1: Redesigned using wood construction, not steel)

Permit Reviews

Permit Number - TC-COM-0925-01675
Permit Status: Complete
Permit Description: Remodel of an existing office (REV 1: Redesigned using wood construction, not steel)
Start Date Submittal Complete Date Status  
11/20/2025 ADMINISTRATIVE v.2 11/20/2025 REQUIRES RESUBMIT Review Details
06/17/2026 SPECIAL INSPECTION REVIEW v.3 06/17/2026 APPROVED Review Details
12/16/2025 ADMINISTRATIVE v.4 12/16/2025 APPROVED Review Details
12/08/2025 ADMINISTRATIVE v.3 12/08/2025 REQUIRES RESUBMIT Review Details
02/18/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/20/2026 APPROVED Review Details
09/15/2025 COMMERCIAL REVIEW - FULL v.1 10/17/2025 APPROVED Review Details
01/21/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/27/2026 APPROVED Review Details
04/09/2026 SPECIAL INSPECTION REVIEW v.2 04/09/2026 REQUIRES RESUBMIT Review Details
12/09/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/17/2025 APPROVED Review Details
05/18/2026 COMMERCIAL REVIEW - FULL REVISION v.1 06/08/2026 APPROVED Review Details
02/11/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/12/2026 REQUIRES RESUBMIT Review Details
04/03/2026 SPECIAL INSPECTION REVIEW v.1 04/08/2026 REQUIRES RESUBMIT Review Details
04/14/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/15/2026 APPROVED Review Details
10/17/2025 ADMINISTRATIVE v.1 10/17/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0925-01675
Permit Status: Complete
Permit Description: Remodel of an existing office (REV 1: Redesigned using wood construction, not steel)
Date Description Comments
10/01/2025 AIR BALANCING REPORT IS REQUIRED.
09/15/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/02/2025 SPECIAL INSPECTION FOR EPOXY INSTALLATIONS IS REQUIRED.
10/02/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
09/15/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/02/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
10/01/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0925-01675
Permite Description: Remodel of an existing office (REV 1: Redesigned using wood construction, not steel)
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
02/27/2026 BULD - Electrical Clearance N/A Not Applicable
02/27/2026 COT - BULD - SWG Clearance N/A Not Applicable
02/27/2026 COT - LCBU - Masonry Pregrout N/A Not Applicable
02/27/2026 COT - LCPL - Rough Soil N/A Not Applicable
03/09/2026 COT - FCON - Fire - Final N/A Partial Pass Address identification (range on building, sweet numbers)

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0925-01675
Permit Description: Remodel of an existing office (REV 1: Redesigned using wood construction, not steel)
Total Completed Inspections - 16
Date Description Inspector Results Comments
12/19/2025 COT - LCBU - Framing Passed
12/19/2025 COT - LCEL - Electrical Intermediate Passed
12/19/2025 COT - LCPL - Plumbing Intermediate Passed
01/15/2026 COT - LCBU - Excavation/Rebar/Zoning Passed
01/15/2026 COT - LCBU - Preslab Passed
01/30/2026 COT - LCBU - Roof Nailing Passed Passed 1/30/26
02/18/2026 COT - LCEL - Electrical Above Ceiling Passed Passed 2/18/26
02/27/2026 COT - LCEL - Electrical Final Passed
02/27/2026 COT - LCBU - Building Final Passed
02/27/2026 COT - LCME - Mechanical Final Passed
02/27/2026 COT - LCPL - Plumbing Final Passed
02/27/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
03/02/2026 TRSP - ROW - Final/Close-Out Passed
02/27/2026 COT - LCBU - Stem Wall/Retaining Wall Passed
02/27/2026 COT - LCME - Mechanical Intermediate Passed
03/24/2026 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION (SSRS).PDF DOCUMENTS VIEW
SIGNED SPECIAL INSPECTION CERTIFICATE-2026-04-07_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
TURNER LABORATORIES WATER STERILIZATION REPORT LONG REALTY-2026-04-07_V1.PDF DOCUMENTS VIEW
LONG REALTY TEST AND BALANCE REPORT AND FLOOR PLAN_V2.PDF DOCUMENTS VIEW
SPECIAL INSP EPOXY TANQUE VERDE 1 15 26 KLINE-2026-01-20_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
SPECIAL INSPECTION FORM WITH COMMENT RESPONSE LETTER-2025-12-09_V2.PDF DOCUMENTS VIEW
25127 - STRUCTURAL CALCULATIONS -9-12-25_V1.PDF DOCUMENTS VIEW
CONS-25-013_LONG_100_SEALED_V1.PDF DOCUMENTS VIEW