Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0925-01650
Permit Details
Apply Date:
09/10/2025
Applicant:
Buddy Heilig
Description:
Replace aluminum wire to range and air conditioner with equivalent size copper wire. Relocate subpanel per code requirements. No changes to any amperages, no new circuits, no utility company shutdowns. Maintenance work only.
Permit Reviews
Permit Number - TC-COM-0925-01650
Permit Status: Complete
Permit Description: Replace aluminum wire to range and air conditioner with equivalent size copper wire. Relocate subpanel per code requirements. No changes to any amperages, no new circuits, no utility company shutdowns. Maintenance work only.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/19/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 09/22/2025 | APPROVED |
| 09/10/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 09/18/2025 | REQUIRES RESUBMIT |
| 09/22/2025 | RESTAMP - COMMERCIAL v.1 | 09/23/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0925-01650
Permit Status: Complete
Permit Description: Replace aluminum wire to range and air conditioner with equivalent size copper wire. Relocate subpanel per code requirements. No changes to any amperages, no new circuits, no utility company shutdowns. Maintenance work only.
| Date | Description | Comments |
|---|---|---|
| 09/23/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 09/10/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0925-01650
Permit Description: Replace aluminum wire to range and air conditioner with equivalent size copper wire. Relocate subpanel per code requirements. No changes to any amperages, no new circuits, no utility company shutdowns. Maintenance work only.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2025 | COT - LCBU - Building Final | Passed | Passed 11/14/25 CLEARANCE INCR | |
| 11/14/2025 | COT - LCEL - Electrical Final | Passed | Passed 11/14/25 CLEARANCE INCR |