Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address:
1010 S RUBIO AV
Address NEW:
1010 S RUBIO AV
Apply Date:
09/09/2025
Applicant:
TFS Solar
Description:
Roof mount 9.14kW DC photovoltaic solar system; 21 modules with microinverters, 3 branches to PV Combiner Box. 50A PV breaker on true 400A bus with 400A MCB. 1016 S Rubio Ave to become primary utility meter under meter consolidation upgrade: TC-COM-0925-01642

Permit Reviews

Permit Number - TC-COM-0925-01648
Permit Status: Inspections complete
Permit Description: Roof mount 9.14kW DC photovoltaic solar system; 21 modules with microinverters, 3 branches to PV Combiner Box. 50A PV breaker on true 400A bus with 400A MCB. 1016 S Rubio Ave to become primary utility meter under meter consolidation upgrade: TC-COM-0925-01642
Start Date Submittal Complete Date Status  
09/11/2025 COMMERCIAL REVIEW - FULL v.1 10/14/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0925-01648
Permit Status: Inspections complete
Permit Description: Roof mount 9.14kW DC photovoltaic solar system; 21 modules with microinverters, 3 branches to PV Combiner Box. 50A PV breaker on true 400A bus with 400A MCB. 1016 S Rubio Ave to become primary utility meter under meter consolidation upgrade: TC-COM-0925-01642
Date Description Comments
09/11/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0925-01648
Permit Description: Roof mount 9.14kW DC photovoltaic solar system; 21 modules with microinverters, 3 branches to PV Combiner Box. 50A PV breaker on true 400A bus with 400A MCB. 1016 S Rubio Ave to become primary utility meter under meter consolidation upgrade: TC-COM-0925-01642
Total Completed Inspections - 5
Date Description Inspector Results Comments
11/20/2025 COT - LCBU - Building Final Passed Passed final 11/20/25 CLEARANCE INCR
11/20/2025 COT - LCEL - Electrical Final Passed Passed final 11/20/25 CLEARANCE INCR
11/20/2025 ENGR Engineering Final Passed
11/24/2025 TRSP - ROW - Notice of Completion Passed
11/20/2025 BULD - Electrical Clearance Passed Passed final 11/20/25 CLEARANCE INCR

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PENCE TRUEN PV 9.14 KW-DRAWINGS_V1.PDF DOCUMENTS VIEW
PENCE TRUEN PV 9.14 KW-SPECS_V1.PDF DOCUMENTS VIEW