Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
6385 E GOLF LINKS RD
Apply Date:
09/26/2024
Applicant:
Christian Karas
Description:
Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.

Permit Reviews

Permit Number - TC-COM-0924-01871
Permit Status: Complete
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Start Date Submittal Complete Date Status  
09/30/2024 COMMERCIAL REVIEW - LIMITED v.1 10/29/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0924-01871
Permite Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
03/20/2025 COT - LCEL - Electrical Intermediate N/A Not Applicable
03/20/2025 BULD - Electrical Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0924-01871
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Total Completed Inspections - 8
Date Description Inspector Results Comments
03/20/2025 COT - LCBU - Building Final Passed
03/20/2025 COT - LCPL - Plumbing Intermediate Passed
03/20/2025 COT - LCEL - Electrical Final Passed
03/20/2025 COT - LCEL - Electrical Above Ceiling Passed
03/20/2025 COT - LCPL - Plumbing Final Passed
01/22/2026 TRSP - ROW - Final/Close-Out Passed Work completed outside of city right of way
01/22/2026 ENGR Engineering Final Passed Public access is safe and uninhibited.
01/22/2026 COT - FCON - Fire - Final Passed