Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0924-01868
Permit Details
Apply Date:
08/14/2024
Applicant:
Adrian Zubiran
Description:
BUILDING 3 SOUTH PV SYSTEM (POI 4), MASTER PLANSET IS UNDER TC-COM-0824-01597. Structural/electrical inspections and all other conditions are under approved permit TC-COM-0824-01597 Permit is for Interconnection and TEP clearance for POI-04
Permit Reviews
Permit Number - TC-COM-0924-01868
Permit Status: Inspections
Permit Description: BUILDING 3 SOUTH PV SYSTEM (POI 4), MASTER PLANSET IS UNDER TC-COM-0824-01597.
Structural/electrical inspections and all other conditions are under approved permit TC-COM-0824-01597
Permit is for Interconnection and TEP clearance for POI-04
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/25/2024 | COMMERCIAL REVIEW - FULL v.1 | 09/26/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0924-01868
Permit Status: Inspections
Permit Description: BUILDING 3 SOUTH PV SYSTEM (POI 4), MASTER PLANSET IS UNDER TC-COM-0824-01597.
Structural/electrical inspections and all other conditions are under approved permit TC-COM-0824-01597
Permit is for Interconnection and TEP clearance for POI-04
Date | Description | Comments |
---|---|---|
09/19/2024 | SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED. | |
09/19/2024 | SPECIAL INSPECTION OF FABRICATORS IS REQUIRED. | |
09/19/2024 | SPECIAL INSPECTION FOR SOILS IS REQUIRED. | |
09/19/2024 | SPECIAL INSPECTION FOR STRUCTURAL STEEL IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0924-01868
Permite Description: BUILDING 3 SOUTH PV SYSTEM (POI 4), MASTER PLANSET IS UNDER TC-COM-0824-01597.
Structural/electrical inspections and all other conditions are under approved permit TC-COM-0824-01597
Permit is for Interconnection and TEP clearance for POI-04
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/31/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Verbal clearance to TEP INCR. BUILDING #3 (SOUTH). 12/31/2024 |