Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
08/14/2024
Applicant:
Adrian Zubiran
Description:
BUILDING 3 SOUTH PV SYSTEM (POI 4), MASTER PLANSET IS UNDER TC-COM-0824-01597. Structural/electrical inspections and all other conditions are under approved permit TC-COM-0824-01597 Permit is for Interconnection and TEP clearance for POI-04

Permit Reviews

Permit Number - TC-COM-0924-01868
Permit Status: Inspections
Permit Description: BUILDING 3 SOUTH PV SYSTEM (POI 4), MASTER PLANSET IS UNDER TC-COM-0824-01597. Structural/electrical inspections and all other conditions are under approved permit TC-COM-0824-01597 Permit is for Interconnection and TEP clearance for POI-04
Start Date Submittal Complete Date Status  
09/25/2024 COMMERCIAL REVIEW - FULL v.1 09/26/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0924-01868
Permit Status: Inspections
Permit Description: BUILDING 3 SOUTH PV SYSTEM (POI 4), MASTER PLANSET IS UNDER TC-COM-0824-01597. Structural/electrical inspections and all other conditions are under approved permit TC-COM-0824-01597 Permit is for Interconnection and TEP clearance for POI-04
Date Description Comments
09/19/2024 SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED.
09/19/2024 SPECIAL INSPECTION OF FABRICATORS IS REQUIRED.
09/19/2024 SPECIAL INSPECTION FOR SOILS IS REQUIRED.
09/19/2024 SPECIAL INSPECTION FOR STRUCTURAL STEEL IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0924-01868
Permite Description: BUILDING 3 SOUTH PV SYSTEM (POI 4), MASTER PLANSET IS UNDER TC-COM-0824-01597. Structural/electrical inspections and all other conditions are under approved permit TC-COM-0824-01597 Permit is for Interconnection and TEP clearance for POI-04
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/31/2024 BULD - Electrical Clearance N/A Partial Pass Verbal clearance to TEP INCR. BUILDING #3 (SOUTH). 12/31/2024

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW