Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
08/14/2024
Applicant:
Austin Matson
Description:
BUILDING 3 SOUTH PV SYSTEM (POI 4), MASTER PLANSET IS UNDER TC-COM-0824-01597. Structural/electrical inspections and all other conditions are under approved permit TC-COM-0824-01597 Permit is for Interconnection and TEP clearance for POI-04

Permit Reviews

Permit Number - TC-COM-0924-01868
Permit Status: Issued
Permit Description: BUILDING 3 SOUTH PV SYSTEM (POI 4), MASTER PLANSET IS UNDER TC-COM-0824-01597. Structural/electrical inspections and all other conditions are under approved permit TC-COM-0824-01597 Permit is for Interconnection and TEP clearance for POI-04
Start Date Submittal Complete Date Status  
09/25/2024 COMMERCIAL REVIEW - FULL v.1 09/26/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0924-01868
Permit Status: Issued
Permit Description: BUILDING 3 SOUTH PV SYSTEM (POI 4), MASTER PLANSET IS UNDER TC-COM-0824-01597. Structural/electrical inspections and all other conditions are under approved permit TC-COM-0824-01597 Permit is for Interconnection and TEP clearance for POI-04
Date Description Comments
09/19/2024 SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED.
09/19/2024 SPECIAL INSPECTION OF FABRICATORS IS REQUIRED.
09/19/2024 SPECIAL INSPECTION FOR SOILS IS REQUIRED.
09/19/2024 SPECIAL INSPECTION FOR STRUCTURAL STEEL IS REQUIRED.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW