Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Apply Date:
09/23/2024
Applicant:
Kim Filuk
Description:
Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.

Permit Reviews

Permit Number - TC-COM-0924-01850
Permit Status: Inspections complete
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Start Date Submittal Complete Date Status  
09/24/2024 COMMERCIAL REVIEW - LIMITED v.1 10/04/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0924-01850
Permit Status: Inspections complete
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Total Outstanding Activity Conditions - 2
Date Name
10/04/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
10/04/2024 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0924-01850
Permit Status: Inspections complete
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Date Description Comments
10/04/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0924-01850
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Total Completed Inspections - 5
Date Description Inspector Results Comments
04/14/2025 COT - FCON - Fire - Final Passed
04/14/2025 COT - LCBU - Building Final Passed
04/14/2025 COT - LCEL - Electrical Final Passed
04/14/2025 COT - LCME - Mechanical Final Passed
04/14/2025 COT - LCPL - Plumbing Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-14-1480 G3S WOW PHASE 2 CITY SUBMITTAL SET 2024-07-18_V1.PDF DOCUMENTS VIEW