Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address:
410 N TOOLE AV
Apply Date:
09/12/2024
Applicant:
Kappcon Inc. General Contractor
Description:
Renovation to convert Suite 110 into Group A-2 for Wine Production and Tasting (Bar) and Wine Retail.

Permit Reviews

Permit Number - TC-COM-0924-01761
Permit Status: Issued
Permit Description: Renovation to convert Suite 110 into Group A-2 for Wine Production and Tasting (Bar) and Wine Retail.
Start Date Submittal Complete Date Status  
09/16/2024 COMMERCIAL REVIEW - FULL v.1 10/15/2024 REQUIRES RESUBMIT Review Details
11/06/2024 COMMERCIAL REVIEW - FULL v.3 11/06/2024 APPROVED Review Details
11/26/2024 COMMERCIAL REVIEW - FULL REVISION v.1 12/17/2024 REQUIRES RESUBMIT Review Details
11/06/2024 RESTAMP - COMMERCIAL v.1 11/13/2024 APPROVED Review Details
10/22/2024 COMMERCIAL REVIEW - FULL v.2 11/05/2024 REQUIRES RESUBMIT Review Details
12/20/2024 COMMERCIAL REVIEW - FULL REVISION v.2 01/14/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0924-01761
Permit Status: Issued
Permit Description: Renovation to convert Suite 110 into Group A-2 for Wine Production and Tasting (Bar) and Wine Retail.
Total Outstanding Activity Conditions - 4
Date Name
10/10/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
11/05/2024 AIR BALANCING REPORT IS REQUIRED.
11/06/2024 This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit.
11/06/2024 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0924-01761
Permit Status: Issued
Permit Description: Renovation to convert Suite 110 into Group A-2 for Wine Production and Tasting (Bar) and Wine Retail.
Date Description Comments
10/31/2024 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor.
10/31/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0924-01761
Permite Description: Renovation to convert Suite 110 into Group A-2 for Wine Production and Tasting (Bar) and Wine Retail.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/31/2025 COT - FCON - Fire - Final N/A Re-inspection required Fire sprinkler permit needed for modification of fire sprinklers, Fire alarm permit needed for modification of the fire alarm, CO2 tanks shall be secured.
01/31/2025 COT - FCON - Sprinkler - Final N/A Re-inspection required Fire sprinkler permit needed for modification of fire sprinklers.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0924-01761
Permit Description: Renovation to convert Suite 110 into Group A-2 for Wine Production and Tasting (Bar) and Wine Retail.
Total Completed Inspections - 18
Date Description Inspector Results Comments
11/18/2024 COT - LCPL - Rough Soil Passed
11/21/2024 COT - LCBU - Preslab Passed OK to place concrete in pour-back area.
11/27/2024 COT - LCBU - Framing Passed
12/04/2024 COT - HCME - Mechanical Intermediate Passed
12/04/2024 COT - LCME - Mechanical Intermediate Passed
12/04/2024 COT - LCEL - Electrical Intermediate Passed OK to insulate and cover walls.
12/04/2024 COT - LCPL - Plumbing Intermediate Passed OK to insulate and cover walls.
01/24/2025 COT - BULD - SWG Clearance Passed Please submit for a commercial gas clearance and gas service.
01/24/2025 COT - LCPL - Gas Pressure Test Passed OK to set commercial gas meter and new service
01/31/2025 BULD - Electrical Clearance Passed No clearance required.
01/31/2025 COT - LCBU - Building Final Passed
01/31/2025 COT - LCEL - Electrical Final Passed
01/31/2025 COT - LCME - Mechanical Final Passed
01/31/2025 COT - LCPL - Plumbing Final Passed
01/31/2025 ENGR Engineering Final Passed Site is clean, no construction activity outside.
01/30/2025 TRSP - ROW - Final/Close-Out Passed
01/31/2025 COT - LCEL - Electrical Above Ceiling Passed
01/31/2025 COT - LCEL - Grounding/Bonding Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-00_PLUMBING_REV3 P1_0_12-17-24_V2.PDF DOCUMENTS VIEW
REVISED HEATER SELECTION_12-17-24_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-TC-COM-0924-01761_R1_V3.PDF DOCUMENTS VIEW