Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0924-01761
Permit Details
Apply Date:
09/12/2024
Applicant:
Nathan Kappler
Description:
Renovation to convert Suite 110 into Group A-2 for Wine Production and Tasting (Bar) and Wine Retail.
Permit Reviews
Permit Number - TC-COM-0924-01761
Permit Status: Inspections
Permit Description: Renovation to convert Suite 110 into Group A-2 for Wine Production and Tasting (Bar) and Wine Retail.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/16/2024 | COMMERCIAL REVIEW - FULL v.1 | 10/15/2024 | REQUIRES RESUBMIT |
11/06/2024 | COMMERCIAL REVIEW - FULL v.3 | 11/06/2024 | APPROVED |
11/06/2024 | RESTAMP - COMMERCIAL v.1 | 11/13/2024 | APPROVED |
10/22/2024 | COMMERCIAL REVIEW - FULL v.2 | 11/05/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0924-01761
Permit Status: Inspections
Permit Description: Renovation to convert Suite 110 into Group A-2 for Wine Production and Tasting (Bar) and Wine Retail.
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
10/10/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
11/05/2024 | AIR BALANCING REPORT IS REQUIRED. |
11/06/2024 | This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit. |
11/06/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0924-01761
Permit Status: Inspections
Permit Description: Renovation to convert Suite 110 into Group A-2 for Wine Production and Tasting (Bar) and Wine Retail.
Date | Description | Comments |
---|---|---|
10/31/2024 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor. | |
10/31/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0924-01761
Permite Description: Renovation to convert Suite 110 into Group A-2 for Wine Production and Tasting (Bar) and Wine Retail.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/18/2024 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0924-01761
Permit Description: Renovation to convert Suite 110 into Group A-2 for Wine Production and Tasting (Bar) and Wine Retail.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/18/2024 | COT - LCPL - Rough Soil | Passed | ||
11/21/2024 | COT - LCBU - Preslab | Passed | OK to place concrete in pour-back area. |