Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0924-01729
Permit Details
Apply Date:
09/06/2024
Applicant:
Thomas McQuillen
Description:
Remodel within existing office space for El Rio
Permit Reviews
Permit Number - TC-COM-0924-01729
Permit Status: Needs resubmittal
Permit Description: Remodel within existing office space for El Rio
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/06/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 09/23/2024 | APPROVED |
11/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/12/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0924-01729
Permit Status: Needs resubmittal
Permit Description: Remodel within existing office space for El Rio
Date | Description | Comments |
---|---|---|
09/06/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-0924-01729
Permite Description: Remodel within existing office space for El Rio
Total Outstanding Inspections - 10
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
COT - FCON - Alarm - Final | N/A | Requested | ||
COT - FCON - Fire - Final | N/A | Requested | ||
ENGR Engineering Final | N/A | Scheduled | ||
TRSP - ROW - Final/Close-Out | N/A | Scheduled | ||
COT - FCON - Sprinkler - Final | N/A | Requested | ||
COT - HCBU - Building Above Ceiling | N/A | Scheduled | ||
COT - HCBU - Building Final | N/A | Scheduled | ||
COT - HCBU - CofO | N/A | Scheduled | ||
COT - HCEL - Electrical Final | N/A | Scheduled | ||
COT - HCPL - Plumbing Final | N/A | Scheduled |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-0924-01729
Permit Description: Remodel within existing office space for El Rio
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/05/2024 | BULD - Electrical Clearance | Passed | No electrical,clearance required. | |
11/05/2024 | COT - HCBU - Framing | Passed | OK to,insulate and cover walls. | |
11/05/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
11/05/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
11/05/2024 | COT - HCPL - Plumbing Above Ceiling | Passed |
Scheduled Inspections
Scheduled Inspections - TC-COM-0924-01729
Status: Needs Resubmittal
Description: Remodel within existing office space for El Rio
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
11/22/2024 | COT - HCBU - CofO | Scheduled | |
11/22/2024 | COT - HCBU - Building Final | Scheduled | |
11/22/2024 | COT - HCEL - Electrical Final | Scheduled | |
11/22/2024 | COT - HCBU - Building Above Ceiling | Scheduled | |
11/22/2024 | COT - HCPL - Plumbing Final | Scheduled | |
11/22/2024 | ENGR Engineering Final | Scheduled | |
11/22/2024 | TRSP - ROW - Final/Close-Out | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.