Permit: TC-COM-0923-02211
Permit Details
Apply Date:
09/14/2023
Applicant:
Cade Somers
Description:
BUILDING 5 - EMERGENCY REPAIRS to building #2 #3 #5 exterior walkways.
Permit Reviews
Permit Number - TC-COM-0923-02211
Permit Status: Complete
Permit Description: BUILDING 5 - EMERGENCY REPAIRS to building #2 #3 #5 exterior walkways.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/14/2023 | COMMERCIAL REVIEW - FULL v.1 | 10/13/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0923-02211
Permit Status: Complete
Permit Description: BUILDING 5 - EMERGENCY REPAIRS to building #2 #3 #5 exterior walkways.
| Date | Description | Comments |
|---|---|---|
| 10/13/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0923-02211
Permite Description: BUILDING 5 - EMERGENCY REPAIRS to building #2 #3 #5 exterior walkways.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2024 | COT - LCBU - Building Final | N/A | Re-inspection required | Inspection is called in for lath. Okay to proceed progress areas. 2/5/2024 1/22/2024 West end add blocking where plywood meet. Shear nailing not per schedule. Add missing anchor bolts. Nail off bottom plates every 16" o.c. Add straps from headers to columns. Buildings #2 and #3. 5/2/2024 5/7/24: corrections made on west end of apartments for buildings #2 and #3. 7/25/24: through the wall metal scuppers missing throughout on all sides of building (per plan). |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0923-02211
Permit Description: BUILDING 5 - EMERGENCY REPAIRS to building #2 #3 #5 exterior walkways.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2024 | COT - LCBU - Framing | Passed | ||
| 08/21/2024 | COT - LCBU - Building Final | Passed | ||
| 08/21/2024 | COT - LCBU - Building Progress | Passed |