Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
09/13/2023
Applicant:
Bruce VanBuskirk
Description:
Tenant improvement to create clubhouse for residents and new exterior patio with BBQ.

Permit Reviews

Permit Number - TC-COM-0923-02200
Permit Status: Inspections
Permit Description: Tenant improvement to create clubhouse for residents and new exterior patio with BBQ.
Start Date Submittal Complete Date Status  
10/22/2024 COMMERCIAL REVIEW - FULL v.1 12/03/2024 REQUIRES RESUBMIT Review Details
12/14/2024 COMMERCIAL REVIEW - FULL v.2 12/17/2024 APPROVED Review Details
12/17/2024 RESTAMP - COMMERCIAL v.1 01/02/2025 APPROVED Review Details
09/13/2023 COMMERCIAL REVIEW - FULL v.1 10/16/2023 REQUIRES RESUBMIT Review Details
11/16/2023 RESTAMP - COMMERCIAL v.1 11/17/2023 APPROVED Review Details
11/16/2023 COMMERCIAL REVIEW - FULL v.2 11/16/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0923-02200
Permit Status: Inspections
Permit Description: Tenant improvement to create clubhouse for residents and new exterior patio with BBQ.
Total Outstanding Activity Conditions - 3
Date Name
01/02/2025 AIR BALANCING REPORT IS REQUIRED.
01/02/2025 COMMISSIONING REPORT IS REQUIRED.
01/02/2025 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0923-02200
Permit Status: Inspections
Permit Description: Tenant improvement to create clubhouse for residents and new exterior patio with BBQ.
Date Description Comments
01/02/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/14/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
12/14/2024 Plans submitted with revision narrative for address change from 1702 W 36th ST to 2410 S. Mission Road #33. Applicant will need to complete the approval process before re-issuance of a permit with the new address by also submitting for an address change through the permit on their tdc-online account.
01/02/2025 Post-Installed Anchor Inspection Report is required.
01/02/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
11/01/2024 SPECIAL INSPECTION INTERMEDIATE IS REQUIRED

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0923-02200
Permite Description: Tenant improvement to create clubhouse for residents and new exterior patio with BBQ.
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
07/31/2024 BULD - Electrical Clearance N/A Not Ready 7/31/24 not ready, please do not call inspections prior to completion of work. The panel has not been relocated and the electrical work is not ready for an electrical clearance. Please allow the superintendent on the job site to call inspections in the next inspection called on electrical clearance that is not ready for inspection will require additional fees.
01/21/2025 COT - BULD - SWG Clearance N/A Not Applicable
07/31/2024 COT - HCBU - Framing N/A Not Ready 7/31/24 not ready, please do not call inspections prior to completion of work. The panel has not been relocated and the electrical work is not ready for an electrical clearance. Please allow the superintendent on the job site to call inspections in the next inspection called on electrical clearance that is not ready for inspection will require additional fees.
07/31/2024 COT - HCEL - Electrical Progress N/A Not Ready 7/31/24 not ready, please do not call inspections prior to completion of work. The panel has not been relocated and the electrical work is not ready for an electrical clearance. Please allow the superintendent on the job site to call inspections in the next inspection called on electrical clearance that is not ready for inspection will require additional fees.
09/10/2024 COT - HCEL - Grounding/Bonding N/A Not Ready 7/29/24: DWV not under test.
7/31/24 not ready, please do not call inspections prior to completion of work. The panel has not been relocated and the electrical work is not ready for an electrical clearance. Please allow the superintendent on the job site to call inspections in the next inspection called on electrical clearance that is not ready for inspection will require additional fees.
9/10/24: not ready
07/31/2024 COT - HCME - Mechanical Progress N/A Not Ready 7/31/24 not ready, please do not call inspections prior to completion of work. The panel has not been relocated and the electrical work is not ready for an electrical clearance. Please allow the superintendent on the job site to call inspections in the next inspection called on electrical clearance that is not ready for inspection will require additional fees.
07/31/2024 COT - HCME - Venting N/A Not Ready 7/31/24 not ready, please do not call inspections prior to completion of work. The panel has not been relocated and the electrical work is not ready for an electrical clearance. Please allow the superintendent on the job site to call inspections in the next inspection called on electrical clearance that is not ready for inspection will require additional fees.
07/31/2024 COT - HCPL - Plumbing Progress N/A Not Ready 7/31/24 not ready, please do not call inspections prior to completion of work. The panel has not been relocated and the electrical work is not ready for an electrical clearance. Please allow the superintendent on the job site to call inspections in the next inspection called on electrical clearance that is not ready for inspection will require additional fees.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0923-02200
Permit Description: Tenant improvement to create clubhouse for residents and new exterior patio with BBQ.
Total Completed Inspections - 9
Date Description Inspector Results Comments
05/30/2024 COT - HCBU - Excavation/Rebar/Zoning Passed 5/30/2024 3 exterior column footers per plan. Okay for concrete placement.
08/15/2024 BULD - Electrical Clearance Passed 7/29/24: not ready. Panel not ready
7/31/24 not ready, please do not call inspections prior to completion of work. The panel has not been relocated and the electrical work is not ready for an electrical clearance. Please allow the superintendent on the job site to call inspections in the next inspection called on electrical clearance that is not ready for inspection will require additional fees.
8/14/24: not ready
8/15/24: INCR TEP CLEARANCE AT 2410 S MISSION RD. UNIT 36 FOR CLUBHOUSE
01/21/2025 COT - HCBU - Building Progress Passed
01/21/2025 COT - HCBU - Framing Passed
01/21/2025 COT - HCEL - Electrical Progress Passed
01/21/2025 COT - HCEL - Grounding/Bonding Passed
01/21/2025 COT - HCME - Mechanical Progress Passed
01/21/2025 COT - HCME - Venting Passed
01/21/2025 COT - HCPL - Plumbing Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV1_2_CONSTRUCTION DOCUMENTS_V2.PDF DOCUMENTS VIEW
REV1_2 REVISION NARRATIVE_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCS_V2.PDF DOCUMENTS VIEW
CONS-2_CONSTRUCTION DOCUMENTS_V2.PDF DOCUMENTS VIEW