Permit: TC-COM-0923-02196
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
1102 E LIMBERLOST DR UNIT B
Address NEW:
1102 E LIMBERLOST DR UNIT B
Apply Date:
09/12/2023
Applicant:
Javier Estrada
Description:
gas line (51 ft) from meter up over roof to service AC unit water heater and gas stove total BTUs or 140,000
Permit Reviews
Permit Number - TC-COM-0923-02196
Permit Status: Issued
Permit Description: gas line (51 ft) from meter up over roof to service AC unit water heater and gas stove total BTUs or 140,000
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/12/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 09/12/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0923-02196
Permit Status: Issued
Permit Description: gas line (51 ft) from meter up over roof to service AC unit water heater and gas stove total BTUs or 140,000
| Date | Description | Comments |
|---|---|---|
| 09/12/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0923-02196
Permite Description: gas line (51 ft) from meter up over roof to service AC unit water heater and gas stove total BTUs or 140,000
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2023 | BULD - Electrical Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0923-02196
Permit Description: gas line (51 ft) from meter up over roof to service AC unit water heater and gas stove total BTUs or 140,000
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2023 | COT - LCPL - Gas Final | Passed | ||
| 09/14/2023 | COT - LCPL - Gas Pressure Test | Passed | ||
| 09/14/2023 | COT - BULD - SWG Clearance | Passed | Approved gas piping and pressure test, SWG clearance is required for unit #B |