Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
141 S STONE AV
Address NEW:
141 S STONE AV
Apply Date:
09/07/2023
Applicant:
Brandy Burke
Description:
tenant improvement as required for a complete retail project.

Permit Reviews

Permit Number - TC-COM-0923-02171
Permit Status: Complete
Permit Description: tenant improvement as required for a complete retail project.
Start Date Submittal Complete Date Status  
09/08/2023 COMMERCIAL REVIEW - FULL v.1 10/26/2023 REQUIRES RESUBMIT Review Details
02/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/23/2024 APPROVED Review Details
12/26/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/26/2023 APPROVED Review Details
11/06/2023 RESTAMP - COMMERCIAL v.1 11/07/2023 APPROVED Review Details
10/31/2023 COMMERCIAL REVIEW - FULL v.2 11/06/2023 APPROVED Review Details
02/27/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/28/2024 APPROVED Review Details
12/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/21/2023 REQUIRES RESUBMIT Review Details
02/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/09/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0923-02171
Permit Status: Complete
Permit Description: tenant improvement as required for a complete retail project.
Date Description Comments
10/26/2023 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
09/08/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/26/2023 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
10/26/2023 Post-Installed Anchor Inspection Report is required.
02/16/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0923-02171
Permite Description: tenant improvement as required for a complete retail project.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/26/2023 COT - HCBU - Building Progress N/A Partial Pass Fire wall in utility room. Condensate line added to discharge into floor drain.
12/11/2023 COT - HCPL - Plumbing Above Ceiling N/A Not Ready Will reschedule when complete.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0923-02171
Permit Description: tenant improvement as required for a complete retail project.
Total Completed Inspections - 31
Date Description Inspector Results Comments
11/22/2023 COT - HCEL - Electrical Underground Passed
11/22/2023 COT - HCME - Mechanical Progress Passed
11/22/2023 COT - HCPL - Plumbing Progress Passed
11/24/2023 TRSP - ROW - Final/Close-Out Passed
11/30/2023 COT - HCBU - Firewall/Fire Barrier/Firestop Passed 11/30/23: 1hr fire wall per plan ok to proceed.
12/11/2023 COT - HCBU - Building Above Ceiling Passed
12/11/2023 COT - HCEL - Electrical Above Ceiling Passed
12/11/2023 COT - HCBU - Framing Passed
12/11/2023 COT - HCME - Mechanical Intermediate Passed
12/11/2023 COT - HCEL - Electrical Intermediate Passed
12/11/2023 COT - HCEL - Electrical Progress Passed
12/11/2023 COT - HCPL - Plumbing Intermediate Passed
12/11/2023 COT - HCPL - Backwater Valve Passed
02/01/2024 BULD - Electrical Clearance Passed
02/01/2024 COT - BULD - SWG Clearance Passed
02/01/2024 ENGR Engineering Final Passed Rick with MW Morisey
02/01/2024 COT - FCON - Sprinkler - Final Passed
02/01/2024 COT - FCON - Fire - Final Passed
02/01/2024 COT - FCON - Alarm - Final Passed
02/01/2024 COT - HCBU - Building Progress Passed
02/01/2024 COT - HCEL - Grounding/Bonding Passed
02/01/2024 COT - HCME - Mechanical Above Ceiling Passed
02/01/2024 COT - HCME - Venting Passed
02/01/2024 COT - HCPL - Gas Final Passed
02/01/2024 COT - HCPL - Gas Pressure Test Passed
02/01/2024 COT - HCPL - Plumbing Above Ceiling Passed
02/05/2024 COT - HCEL - Electrical Final Passed
02/12/2024 COT - HCBU - Building Final Passed
02/12/2024 COT - HCPL - Plumbing Final Passed
02/15/2024 COT - HCME - Mechanical Final Passed
03/01/2024 COT - HCBU - CofO Passed OK to make application for a Certificate of Occupancy.

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
FINAL HEALTH INSPECTION_V1.PDF DOCUMENTS VIEW
24B0209 TURNER FINAL 02 13 2024 1004-2024-02-14_V2.PDF DOCUMENTS VIEW
SIGNEDSTAMPED SPECIAL INSPECTIONS-2024-02-14_V2.PDF DOCUMENTS VIEW
SIGNEDSTAMPED SPECIAL INSPECTIONS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-2_PLAN SET_V2_WILDAN APPROVE_V2.PDF DOCUMENTS VIEW
WILLDAN_APPROVED_STRUCTRUAL LOAD ANALYSIS - CALC'S_V1_V1.PDF DOCUMENTS VIEW