Permit: TC-COM-0923-02169
Permit Details
Apply Date:
09/07/2023
Applicant:
Description:
Ground up 7 story self storage building w/ MEP structural and site work
Permit Reviews
Permit Number - TC-COM-0923-02169
Permit Status: Fees due
Permit Description: Ground up 7 story self storage building w/ MEP structural and site work
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/27/2023 | COMMERCIAL REVIEW - FULL v.2 | 10/27/2023 | REQUIRES RESUBMIT |
12/08/2023 | RESTAMP - COMMERCIAL v.1 | 12/14/2023 | APPROVED |
11/02/2023 | COMMERCIAL REVIEW - FULL v.3 | 11/30/2023 | REQUIRES RESUBMIT |
09/08/2023 | COMMERCIAL REVIEW - FULL v.1 | 10/09/2023 | REQUIRES RESUBMIT |
12/01/2023 | COMMERCIAL REVIEW - FULL v.4 | 12/08/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0923-02169
Permit Status: Fees due
Permit Description: Ground up 7 story self storage building w/ MEP structural and site work
Total Outstanding Activity Conditions - 13
Date | Name |
---|---|
09/08/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
09/08/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
12/08/2023 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
12/08/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
12/08/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
12/08/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
12/08/2023 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
12/08/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
12/08/2023 | Masonry Inspection Report submittal review is required. |
12/08/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
12/08/2023 | SPECIAL INSPECTION FOR SPRAY-APPLIED FIRE PROOFING IS REQUIRED. |
12/08/2023 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
12/08/2023 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |