Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
8940 E RITA PARK DR
Apply Date:
08/17/2026
Applicant:
Christopher Perry
Description:
One to one swap of (1) existing 4000A 3-Phase 277/480V main electrical switchboard "MSB3" and and (4) existing 3-Phase 277/480V pad mounted distribution cabinets, "IFS-5A", IFS-5B", "IFS-15", and "IFS-16" less than 400A each. No modifications or upgrades are being made, the work is part of the customers long-term facilities preventative maintenance schedule. All equipment was designed and manufactured by EATON to match the existing EATON equipment exactly.

Permit Reviews

Permit Number - TC-COM-0826-01308
Permit Status: Issued
Permit Description: One to one swap of (1) existing 4000A 3-Phase 277/480V main electrical switchboard "MSB3" and and (4) existing 3-Phase 277/480V pad mounted distribution cabinets, "IFS-5A", IFS-5B", "IFS-15", and "IFS-16" less than 400A each. No modifications or upgrades are being made, the work is part of the customers long-term facilities preventative maintenance schedule. All equipment was designed and manufactured by EATON to match the existing EATON equipment exactly.
Start Date Submittal Complete Date Status  
08/21/2026 COMMERCIAL REVIEW - LIMITED v.1 09/04/2026 REQUIRES RESUBMIT Review Details
09/16/2026 COMMERCIAL REVIEW - LIMITED v.3 09/18/2026 APPROVED Review Details
09/15/2026 COMMERCIAL REVIEW - LIMITED v.2 09/16/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0826-01308
Permit Status: Issued
Permit Description: One to one swap of (1) existing 4000A 3-Phase 277/480V main electrical switchboard "MSB3" and and (4) existing 3-Phase 277/480V pad mounted distribution cabinets, "IFS-5A", IFS-5B", "IFS-15", and "IFS-16" less than 400A each. No modifications or upgrades are being made, the work is part of the customers long-term facilities preventative maintenance schedule. All equipment was designed and manufactured by EATON to match the existing EATON equipment exactly.
Date Description Comments
08/21/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
08/21/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.