Permit: TC-COM-0826-01276
Permit Details
Apply Date:
08/11/2026
Applicant:
Misael Leon
Description:
Replace existing 3-phase service entrance equipment including meter socket and service entrance conductors. Reuse existing raceway where feasible and replace service mast if required. Coordinate utility disconnect/reconnect and complete installation per current NEC and utility requirements. Like-for-like replacement.
Permit Reviews
Permit Number - TC-COM-0826-01276
Permit Status: Complete
Permit Description: Replace existing 3-phase service entrance equipment including meter socket and service entrance conductors. Reuse existing raceway where feasible and replace service mast if required. Coordinate utility disconnect/reconnect and complete installation per current NEC and utility requirements. Like-for-like replacement.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/14/2026 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 08/14/2026 | APPROVED |
| 08/12/2026 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 08/12/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0826-01276
Permit Status: Complete
Permit Description: Replace existing 3-phase service entrance equipment including meter socket and service entrance conductors. Reuse existing raceway where feasible and replace service mast if required. Coordinate utility disconnect/reconnect and complete installation per current NEC and utility requirements. Like-for-like replacement.
| Date | Description | Comments |
|---|---|---|
| 08/14/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0826-01276
Permit Description: Replace existing 3-phase service entrance equipment including meter socket and service entrance conductors. Reuse existing raceway where feasible and replace service mast if required. Coordinate utility disconnect/reconnect and complete installation per current NEC and utility requirements. Like-for-like replacement.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2026 | COT - LCEL - Electrical Final | Passed | ||
| 09/08/2026 | BULD - Electrical Clearance | Passed |