Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
08/05/2026
Applicant:
Cascade Electric
Description:
Replace damaged three phase meter can with new 200 amp three phase meter can and meter. replace 200 amp three phase disconnect and panel with new three phase 200 amp panel. update grounding and bonding. install new riser to code. install new surge protection device.

Permit Reviews

Permit Number - TC-COM-0826-01239
Permit Status: Issued
Permit Description: Replace damaged three phase meter can with new 200 amp three phase meter can and meter. replace 200 amp three phase disconnect and panel with new three phase 200 amp panel. update grounding and bonding. install new riser to code. install new surge protection device.
Start Date Submittal Complete Date Status  
08/10/2026 COMMERCIAL PDSD SIMPLE REVIEW v.3 08/11/2026 REQUIRES RESUBMIT Review Details
08/06/2026 COMMERCIAL PDSD SIMPLE REVIEW v.2 08/06/2026 REQUIRES RESUBMIT Review Details
08/05/2026 COMMERCIAL PDSD SIMPLE REVIEW v.1 08/05/2026 REQUIRES RESUBMIT Review Details
08/25/2026 COMMERCIAL PDSD SIMPLE REVIEW v.4 08/26/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0826-01239
Permit Status: Issued
Permit Description: Replace damaged three phase meter can with new 200 amp three phase meter can and meter. replace 200 amp three phase disconnect and panel with new three phase 200 amp panel. update grounding and bonding. install new riser to code. install new surge protection device.
Date Description Comments
08/26/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.