Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0825-01512
Permit Details
Status:
Needs Resubmittal
Type:
Commercial Building
Address:
7671 E TANQUE VERDE RD BLDG D
Address NEW:
7671 E TANQUE VERDE RD BLDG D
Apply Date:
08/12/2025
Applicant:
Kristina Losorelli
Description:
EV Charger Station Installation - (4) EV Chargers (1) NEW 100A, 120/208, 3?, 4W, 22kAIC NEMA 3R ENCLOSURE. (4) NEW 60A, 240V, 2P, 10kAIC CIRCUIT BREAKERS. (1) NEW 20A, 120V, 1P, 10kAIC CIRCUIT BREAKERS
Permit Reviews
Permit Number - TC-COM-0825-01512
Permit Status: Needs resubmittal
Permit Description: EV Charger Station Installation -
(4) EV Chargers (1) NEW 100A, 120/208, 3?, 4W, 22kAIC NEMA 3R ENCLOSURE. (4) NEW 60A, 240V, 2P, 10kAIC CIRCUIT BREAKERS. (1) NEW 20A, 120V, 1P, 10kAIC CIRCUIT BREAKERS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/13/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 08/13/2025 | REQUIRES RESUBMIT |
| 09/10/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 09/29/2025 | REQUIRES RESUBMIT |
| 11/24/2025 | COMMERCIAL REVIEW - LIMITED v.3 | 12/10/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0825-01512
Permit Status: Needs resubmittal
Permit Description: EV Charger Station Installation -
(4) EV Chargers (1) NEW 100A, 120/208, 3?, 4W, 22kAIC NEMA 3R ENCLOSURE. (4) NEW 60A, 240V, 2P, 10kAIC CIRCUIT BREAKERS. (1) NEW 20A, 120V, 1P, 10kAIC CIRCUIT BREAKERS
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/13/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Conditions
Permit Number - TC-COM-0825-01512
Permit Status: Needs resubmittal
Permit Description: EV Charger Station Installation -
(4) EV Chargers (1) NEW 100A, 120/208, 3?, 4W, 22kAIC NEMA 3R ENCLOSURE. (4) NEW 60A, 240V, 2P, 10kAIC CIRCUIT BREAKERS. (1) NEW 20A, 120V, 1P, 10kAIC CIRCUIT BREAKERS
| Date | Description | Comments |
|---|---|---|
| 08/13/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |